An Entity of Type: architectural structure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Gray County Wind Farm near Montezuma, Kansas was the largest wind farm in Kansas and the largest in the United States not mandated by a state regulatory commission back in 2001. The site consists of 170 Vestas V-47 wind turbines with a total nameplate capacity of 112 MW. Each turbine tower is 217 feet high, with blades 77 feet long, and a generating capacity of 660 kW. Owned and operated by NextEra Energy Resources, Gray County Wind Farm became fully operational in November 2001. Its construction cost an estimated $100 million. The average wind speed at the site is approximately 20 mph. The area is primarily used for farmland.

Property Value
dbo:abstract
  • Gray County Wind Farm near Montezuma, Kansas was the largest wind farm in Kansas and the largest in the United States not mandated by a state regulatory commission back in 2001. The site consists of 170 Vestas V-47 wind turbines with a total nameplate capacity of 112 MW. Each turbine tower is 217 feet high, with blades 77 feet long, and a generating capacity of 660 kW. Owned and operated by NextEra Energy Resources, Gray County Wind Farm became fully operational in November 2001. Its construction cost an estimated $100 million. The average wind speed at the site is approximately 20 mph. The area is primarily used for farmland. (en)
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 5162533 (xsd:integer)
dbo:wikiPageLength
  • 1902 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1106885567 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dct:subject
gold:hypernym
georss:point
  • 37.60611111111111 -100.37944444444445
rdf:type
rdfs:comment
  • Gray County Wind Farm near Montezuma, Kansas was the largest wind farm in Kansas and the largest in the United States not mandated by a state regulatory commission back in 2001. The site consists of 170 Vestas V-47 wind turbines with a total nameplate capacity of 112 MW. Each turbine tower is 217 feet high, with blades 77 feet long, and a generating capacity of 660 kW. Owned and operated by NextEra Energy Resources, Gray County Wind Farm became fully operational in November 2001. Its construction cost an estimated $100 million. The average wind speed at the site is approximately 20 mph. The area is primarily used for farmland. (en)
rdfs:label
  • Gray County Wind Farm (en)
owl:sameAs
geo:geometry
  • POINT(-100.37944793701 37.606109619141)
geo:lat
  • 37.606110 (xsd:float)
geo:long
  • -100.379448 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License
  NODES
Project 1