The Lincoln Gap Wind Farm is a wind farm in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia, Australia. It consists of 59 wind turbines and generates a total of 212 MW of electricity. Construction began in late 2017 and was initially expected to be commissioned in late 2018. Construction was delayed in July 2018 when unexploded ordnance was discovered on the site, left from historic military testing. The site is not far from the Cultana Training Area.

Property Value
dbo:abstract
  • The Lincoln Gap Wind Farm is a wind farm in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia, Australia. It consists of 59 wind turbines and generates a total of 212 MW of electricity. Construction began in late 2017 and was initially expected to be commissioned in late 2018. Construction was delayed in July 2018 when unexploded ordnance was discovered on the site, left from historic military testing. The site is not far from the Cultana Training Area. Following Senvion's European parent company commencing insolvency proceedings, Vestas was engaged to provide maintenance services for the 126 MW first stage, and the 24 3.6 MW turbines for the second stage. The 212 MW wind farm reached full generation capacity in late April 2022. (en)
dbo:buildingStartDate
  • 2017
dbo:buildingStartYear
  • 2017-01-01 (xsd:gYear)
dbo:capacityFactor
  • 43.000000 (xsd:float)
dbo:country
dbo:location
dbo:openingYear
  • 2019-01-01 (xsd:gYear)
dbo:status
  • U
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 56204422 (xsd:integer)
dbo:wikiPageLength
  • 7516 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1085779705 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • Expected mid-2019 (en)
dbp:constructionBegan
  • 2017 (xsd:integer)
dbp:cost
  • (en)
  • AUD 170M (en)
  • AUD 300M (en)
dbp:country
  • Australia (en)
dbp:location
  • 15 (xsd:integer)
dbp:name
  • Lincoln Gap Wind Farm (en)
dbp:owner
  • Nexif Energy Australia (en)
dbp:psAnnualGeneration
  • 800 (xsd:integer)
dbp:psElectricalCapFac
  • 43.0
dbp:psElectricalCapacity
  • 212 (xsd:integer)
dbp:psStorageCapacity
  • 10 (xsd:integer)
dbp:psUnitsManuModel
  • Vestas V136 (en)
  • Senvion 3.6M140 EBC (en)
dbp:psUnitsOperational
  • 24 (xsd:integer)
  • 35 (xsd:integer)
  • (en)
dbp:psUnitsPlanned
  • 42 (xsd:integer)
dbp:status
  • U (en)
dbp:website
dbp:wikiPageUsesTemplate
dbp:windFarmType
  • Onshore (en)
dcterms:subject
rdf:type
rdfs:comment
  • The Lincoln Gap Wind Farm is a wind farm in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia, Australia. It consists of 59 wind turbines and generates a total of 212 MW of electricity. Construction began in late 2017 and was initially expected to be commissioned in late 2018. Construction was delayed in July 2018 when unexploded ordnance was discovered on the site, left from historic military testing. The site is not far from the Cultana Training Area. (en)
rdfs:label
  • Lincoln Gap Wind Farm (en)
owl:sameAs
prov:wasDerivedFrom
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Lincoln Gap Wind Farm (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License
  NODES