Line M4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
M4 is one of the five lines of the Bucharest Metro. It is currently 7.44 km (4.6 mi) long and runs from Gara de Nord to Străulești, following the Griviței and Bucureștii Noi avenues.[1]
History
editConstruction of the line started in September 1989, shortly before the Romanian Revolution. The tunnels were built up to where Parc Bazilescu is today. Construction was abandoned afterwards and was resumed later on in the 90's. The first section of the M4 opened on 1 March 2000 from Gara de Nord to 1 Mai. After many years of delays the next section to Parc Bazilescu was finally opened on 1 July 2011. Parc Bazilescu was not in the initial plan and was only built to open the section quicker.[2]
In 2013, construction started on the final 1.6 km (1.0 mi) section of the M4 to Străulești, along with Străulești depot. On 3 September 2015 tunneling work was completed.[3] The service was extended with two more stations, Laminorului and Străulești, which opened on 31 March 2017.[4]
Rolling stock
editDespite being one of the newest lines on the network, the M4 runs old Astra IVA trains.
The Astra IVA trains will soon be retired from the Bucharest Metro and replaced with Alstom Metropolis trains.[5]
Planned extension
editIn 2022, the Southern extension from Gara de Nord to Gara Progresul was approved. The tender for this extension was launched on 26 April 2024.[6] The plans are for M4 to be extended with 14 new stations.[7]
References
edit- ^ "Metrorex (2018). Details for M1, M2, M3, M4 at page 6" (PDF). Metrorex.ro. Retrieved 2020-09-21.
- ^ "Prezentare generală M4". forum.construim-romania.ro. Retrieved 2015-09-04.
- ^ "Progrese la Magistrala 4: Cand vom avea metrou pana la Lacul Străulești". Retrieved 2015-09-04.
- ^ Antena 3. "Metrorex a deschis circulaţia în staţiile de metrou Laminorului şi Străuleşti" [Metrorex has opened traffic in the metro stations Laminorului and Străuleşti]. Antena 3 (in Romanian). Retrieved 2017-03-31.
{{cite news}}
: CS1 maint: numeric names: authors list (link) - ^ "Primul tren de metrou Alstom pentru M5 a ajuns la București. Încă nouă ar putea sosi anul acesta". 23 April 2024.
- ^ "BREAKING S-a lansat licitația pentru extinderea Magistralei 4 de metrou, până la Gara Progresul". 26 April 2024.
- ^ "BREAKING S-a lansat licitația pentru extinderea Magistralei 4 de metrou, până la Gara Progresul". 26 April 2024.
External links
edit- Metrorex vrea sa extinda Magistrala 4 cu 2 statii at stirileprotv.ro (in Romanian)
- Metrorex a publicat anuntul de intentie privind organizarea unei proceduri de achizitie a lucrarilor de structura pentru obiectivul „Magistrala 4. Racord 2. PLS Zarea – Laminorului – Străulești”. at metrorex.ro (in Romanian)
- Linia de metrou de la Gara de Nord spre 1 Mai va ajunge pana in zona lacului Străulești at incont.ro (in Romanian)