Buksefjord hydroelectric power plant

The Buksefjord hydroelectric power plant is the first and largest hydroelectric power plant in Greenland. It was built by Nuuk-Kraft and it is operated by Nukissiorfiit, Greenland's national energy company.[1]

Buksefjord hydroelectric power plant
Map
CountryGreenland
LocationBuksefjord
Coordinates63°55′16″N 50°53′26″W / 63.92111°N 50.89056°W / 63.92111; -50.89056
StatusOperational
Construction began1990
Commission date1993
Construction cost$ 190.23 million
OwnerNukissiorfiit
Power generation
Units operational3 x 15 MW
Nameplate capacity45 MW
External links
Websitewww.nukissiorfiit.gl

In 1984–85, Greenland's energy authority prepared a Greenland's hydroelectricity development program. At that time all electricity in Greenland was produced by oil based fuels, but there had been a sharp rise in oil prices in the preceding years. Construction of a plant in Buksefjord was proposed by a private consortium in 1988. In 1989, four companies were invited to a public tender. However, later it was decided that construction of the plant will be financed by the Home Rule of Greenland and the plant will be rented to Nuuk-Kraft consortium. Construction of the plant was approved by the Parliament of Greenland in 1990.[1] It was commissioned in 1993.[2]

Unconventionally, the power station is situated 600 metres (2,000 ft) inside a mountain and it consists of 14 kilometres (8.7 mi) of tunnels.[2] The upper reservoir, Kang Lake, is situated 249 metres (817 ft) above sea level at Buksefjord. Due to damming and deep inlet, it has a total effective volume of 1.9 cubic kilometres (0.46 cu mi), which is six times more than the annual water consumption by the plant. From the lake, a 10.5-kilometre (6.5 mi) long inlet pressure tunnel runs down to the plant.[1]

Originally, the plant had two turbines with capacity of 15 MW each. In 2008, a third turbine with the same capacity was installed.[2][3]

The generated power is transferred to Nuuk over the 57-kilometre (35 mi) long Buksefjord–Nuuk power line, which includes the Ameralik Span, the world's longest span.[1][3]

Nukissiorfiit plans to double the annual power output of the Buksefjord plant by 2029, as a result of increased demand in Nuuk. This involves a new 16-km-long transfer tunnel from the current intake at Lake Kangerluarssunnguup Tasersua to Lake Isortuarsuup Tasia as well as the construction of a new power station adjecent to the current one. This will add 71MW of capacity and greatly increase the available water. The project is planned to be tendered for construction in 2024.[4]

See also

edit

References

edit
  1. ^ a b c d Andersen, J. Raae; Teisen, Elisabeth (1990-07-06). "Grønlands første store vandkraftværk" [Greenland's first large hydroelectric power station]. Ingeniøren (in Danish). Archived from the original on 2009-07-17. Retrieved 2010-12-31.
  2. ^ a b c "Hydropower in Greenland". Greenland Development. Archived from the original on 2010-11-17. Retrieved 2010-12-31.
  3. ^ a b Holmsgaard, Erik (2008-12-05). "Buksefjorden for fuld kraft" [Buksefjord in full power]. Sermitsiaq (in Danish). Archived from the original on 2013-01-14. Retrieved 2010-12-31.
  4. ^ hydroreviewcontentdirectors (2023-04-25). "Contract awarded for expansion of Greenland's largest hydroelectric plant". Hydro Review. Retrieved 2024-07-23.
  NODES
Note 1
Project 1