District Court Pune is an underground metro station on the North-South corridor of the Purple Line and an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I.[1] Since then, the Purple Line was operational between PCMC and Civil Court. On 29 September 2024, the launch of Pune Metro Phase I was completed and the Purple Line was fully operational from PCMC to Swargate.[2] Whereas, the Aqua Line operates between Vanaz and Ramwadi.[3] This station will also serve as a future interchange for Aqua Line and Line 3 of Pune Metro.[4] It is one of the deepest metro stations in India at the depth of 33m (108 ft.). The roof design of the station allows the sunlight to directly reach the underground platforms.[5]

Civil Court
logo of Pune Metro Pune Metro station
Civil Court metro station under construction
General information
LocationShivajinagar, Pune, Maharashtra 411001
Coordinates18°31′37″N 73°51′29″E / 18.52689°N 73.85802°E / 18.52689; 73.85802
Owned byMaharashtra Metro Rail Corporation Limited (MAHA-METRO)
Operated byPune Metro
Line(s)Purple Line Aqua Line
PlatformsSide platform
Platform-1 → Ramwadi
Platform-2 → Vanaz
Island platform
Platform-3 → Swargate
Platform-4 → PCMC Bhavan
Tracks4
Construction
Structure typeUnderground, Elevated, Double track
Platform levels4
AccessibleYes Disabled access
Other information
Station codeCVC
History
Opened1 August 2023; 16 months ago (2023-08-01)
Electrified25 kV 50 Hz AC overhead catenary
Services
Preceding station logo of Pune Metro Pune Metro Following station
PMC Bhavan
towards Vanaz
Aqua Line Mangalwar Peth
towards Ramwadi
Shivaji Nagar
towards PCMC Bhavan
Purple Line Kasba Peth
towards Swargate
Location
Map

Station layout

edit

Aqua Line - Station Layout

Civil Court track layout
 
 
 
 
P2
 
 
 
P1
 
 
 
 
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left  
Platform 1
Eastbound
Towards → Ramwadi
Next Station: Mangalwar Peth
Platform 2
Westbound
Towards ← Vanaz
Next Station: PMC Bhavan
Side platform | Doors will open on the left  
L3

Purple Line - Station Layout

Civil Court track layout
 
 
 
 
P4
 
 
P3
 
 
 
 
Station with two tracks and one Island platform
G Street level Exit/ Entrance
M Mezzanine Fare control, station agent, Ticket/token, shops
P Platform 3
Southbound
Towards → Swargate
Next Station: Kasba Peth
Island platform | Doors will open on the right  
Platform 4
Westbound
Towards ← PCMC Bhavan
Next Station: Shivaji Nagar

Entry/Exit

edit

See also

edit

References

edit
  1. ^ "PM to flag off metro trains marking inauguration of completed sections of Pune Metro". pib.gov.in. 30 July 2023. Retrieved 3 August 2023.
  2. ^ "PM to inaugurate Pune Metro section of District Court to Swargate". pib.gov.in. 28 September 2024. Retrieved 29 September 2024.
  3. ^ "Comfortable, convenient & economic: Citizens on Metro launch till Ramwadi". The Times of India. 7 March 2024. ISSN 0971-8257. Retrieved 7 March 2024.
  4. ^ Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times. Retrieved 3 August 2023.
  5. ^ "Civil Court interchange, where elevated & underground lines meet". The Times of India. 11 August 2023. ISSN 0971-8257. Retrieved 12 August 2023.
edit
  NODES
Idea 1
idea 1
Note 1