The Glasgow Subway is an underground light metro system in Glasgow, Scotland. Opened on 14 December 1896, it is the third-oldest underground rail transit system in the world after the London Underground and the Budapest Metro.[2] It is also one of the very few railways in the world with a track running gauge of 4 ft (1,219 mm). Originally a cable railway, the subway was later electrified, but the double-track circular line was never expanded. The line was originally known as the Glasgow District Subway, and was thus the first mass transit system to be known as a "subway"; it was later renamed Glasgow Subway Railway. In 1936 it was renamed the Glasgow Underground. Despite this rebranding, many Glaswegians continued to refer to the network as "the Subway". In 2003, the name "Subway" was officially readopted by its operator, the Strathclyde Partnership for Transport (SPT).

Glasgow Subway
Fo-thalamh Ghlaschu
Overview
LocaleGlasgow, Scotland
Transit typeLight metro
Number of lines2
Number of stations15
Annual ridership13.4 million (2023/24)[1]
WebsiteOfficial website
Operation
Began operation14 December 1896; 128 years ago (1896-12-14)
Operator(s)Strathclyde Partnership for Transport
Technical
System length6+12 mi (10.5 km)
Track gauge4 ft (1,219 mm) narrow gauge
ElectrificationThird rail600 V DC

The system is not the oldest underground railway in Glasgow: that distinction belongs to a three-mile (five-kilometre) section of the Glasgow City and District Railway opened in 1886, now part of the North Clyde Line of the suburban railway network, which runs in a tunnel under the city centre between High Street and west of Charing Cross. Another major section of underground suburban railway line in Glasgow is the Argyle Line, which was formerly part of the Glasgow Central Railway.

Route

edit
Glasgow Subway
Kelvinbridge  
 
 
 
 
 
 
Hillhead
 
 
 
St George's Cross
Kelvinhall
 
 
 
Cowcaddens
Partick  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Merkland Street
 
 
 
 
 
 
 
 
Buchanan Street
 
 
 
 
 
 
 
 
 
 
 
St Enoch
 
 
 
 
 
 
 
 
Govan
 
 
 
Bridge Street  
Broomloan Depot
 
 
 
West Street
 
 
 
 
 
Shields Road  
Ibrox
 
 
Kinning Park
Cessnock
 
 
 
 
 
 park-and-ride stations

The subway system was constructed as a circular loop almost 6+12 miles (10.5 kilometres) long and extends both north and south of the River Clyde. The tracks have the unusual narrow gauge of 4 ft (1,219 mm) and a nominal tunnel diameter of 11 ft (3.4 m), even smaller than that of the deep-level lines of the London Underground (11 ft 8+14 in or 3.56 m at their smallest); consequently, the rolling stock for the Glasgow Subway is considerably smaller.

The system is described as two lines, the Outer Circle and Inner Circle, which simply refers to the double track, having trains running clockwise and anticlockwise respectively around the same route in separate tunnels. Stations use a variety of platform layouts including single island platforms, opposing side platforms and in some stations such as Hillhead one side and one island platform.

The subway's running lines are entirely underground, although the maintenance depot at Broomloan Road (located between the Govan and Ibrox stations) is above ground, as was the earlier depot, also at Govan. Prior to modernisation, trains used to be lifted by crane onto and off the tracks.[3] Modernisation brought the installation of points and an access ramp between Govan and Ibrox where trains can exit the tunnel system for maintenance, cleaning or storage.

Power is supplied to the trains at 600 V DC, using a third rail, via sub-stations at five locations on the circle:[citation needed] Broomloan Depot, Byres Road (Hillhead), Dundasvale (Cowcaddens), Bridge Street and Cornwall Street (Kinning Park). In the event of maintenance or repair work, the system can operate a full service (six trains per circle) with one of the sub-stations inoperative.[citation needed]

The system is owned and operated by the Strathclyde Partnership for Transport (SPT), formerly Strathclyde Passenger Transport, and carried 12.7 million passengers in the period 2019–20.[4] The Subway has been policed by British Transport Police since 2007.[5]

History

edit

1896–1977

edit

Glasgow District Subway Act 1890
Act of Parliament
 
Long titleAn Act for making Subways in the city and suburbs of Glasgow; and for other purposes.
Citation53 & 54 Vict. c. clxii
Dates
Royal assent4 August 1890
Other legislation
Repealed byGlasgow Corporation Consolidation (Water, Transport and Markets) Order Confirmation Act 1964
Status: Repealed
Text of statute as originally enacted

The Glasgow District Subway Company began construction of the underground in 1891 and it opened on 14 December 1896.[6] The subway was powered by a clutch-and-cable system, with one cable for each direction.

The cable was driven from a steam-powered plant between West Street and Shields Road stations. There was no additional cable to allow trains to reach the depot; instead, they were transferred to and from the running lines by crane operating over a pit at the Govan workshops. This also meant that the two tracks could be completely separate, with no points anywhere. The company's headquarters were in the upper rooms at St Enoch subway station; this distinctive ornate building still stands in St Enoch Square and was subsequently used as a travel information office by SPT and is now a coffee shop.[7]

 
Recreated Glasgow Subway station entrance at the Riverside Museum

When the Subway first opened, single-carriage four axle (twin truck) trains were operated.[8]: 28  Late in the evening on the opening day, after 11 pm, one car laden with 60 passengers was run into by another under the River Clyde. Four people were injured, one being taken to the infirmary.[9] This entailed the closure of the Subway until 19 January 1897.[10] The 20 original wooden bodied carriages were built by the Oldbury Railway Carriage and Wagon Company, of Oldbury, Worcestershire. Many continued in service until 1977 in an upgraded form. A further 10 were delivered by the same manufacturer in 1897. From 1898, second four axle (trailer) carriages without a cable gripper mechanism were added, though they were considerably shorter than the front (gripper) carriage. These additional carriages, eventually numbering 30, were built by Hurst Nelson & Company, Motherwell, Lanarkshire. These carriages were soon expanded to match the length of the front carriages, although carriage 41T has been restored to its original length and cut longitudinally and number 39T is preserved in the Riverside Museum. Most of the gripper carriages were subsequently converted to electric traction in 1935. All carriages were originally built with lattice gates (instead of doors) at the ends; many were converted to air-operated sliding doors in the 1960s, but a few retained the gates until 1977.[11]

All 15 stations were built with island platforms. The trains were thus built with doors on one side only[citation needed]. Power for the electric lighting in the trains was supplied by two parallel wall-mounted rails (known as "T-irons") at window level on the non-platform side of the trains; trains were originally equipped with wheels to pick up the electricity but changed to skids at electrification.[8]: 43  The trains remained cable-hauled until 1935, though the anachronistic way of supplying power for the lighting continued until 1977. The lighting circuit was also part of the operation of the signalling system.[12]

Opening times of the Glasgow Subway have varied through the years, now open 06:30 to 23:40 Monday to Saturday and 10:00 to 18:12 on Sunday following a trial period between April 2011 and 2012 when the subway was open from 09:00–18:30.

Glasgow Corporation took over the company in 1923[13] at a cost of £385,000 (equivalent to £27,736,099 in 2023).[14] In 1935, the existing trains were converted to electric power delivered by a third rail at 600 volts, direct current.[8]: 45  From March until December 1935, clockwise trains were cable-hauled, while anti-clockwise ones were electric. The conversion to electric traction cost £120,000[15] (equivalent to £10,521,927 in 2023).[14] The last cable drawn car service was on 30 November 1935, and was driven by Robert Boyd.[16]

The trains lost their original plum and cream-coloured liveries, being painted red and white instead. From the 1950s the trains became all red—in a shade similar to that of London buses. During the early 1970s, trailer carriage number 41 was repainted in the original 1896 livery.

 
Glasgow Subway before the Beeching cuts

According to Keith Anderson World War II brought an "unprecedented" level of use by passengers. Anderson attributes this, and an increase in patronage in the years leading up to the conflict, to the expansion of the local shipyard workforce due to the need for rearmament.[17] Unlike its larger counterpart in London the system's stations did not make good air-raid shelters as they were much less deep. On 18 September 1940, during World War II, a German bomb, which dropped during a night raid on Glasgow and may have been intended for nearby naval facilities, landed on a bowling green to the south of Merkland Street station. The resulting explosion caused damage to both tunnels, leading to closure of part of the system until repairs were completed in January 1941. The system suffered no other damage during the conflict. It did lose staff who were called up to participate in the war effort.[17]

After the Beeching Axe of the 1960s, both St Enoch and Buchanan Street mainline stations were closed and demolished; there was no direct connection between the underground and mainline stations of Buchanan Street as they were over 500 m (550 yd) distant. The Subway had no direct passenger connection to the national railway network—a major weakness—although Buchanan Street and Merkland Street stations were a short walk from Queen Street and Partickhill British Rail stations respectively.

Before the 1977–1980 modernisation, the stations had a distinctive earthy odour.[clarification needed] The trains (mostly dating back to 1896) were always formed with two carriages—the front (motor) carriage with red leather seats and the rear (trailer) carriage with brown leather seats.[8] Smoking was permitted in the rear carriage only. The backs of the seats were attached to the sides of the carriages, which moved semi-independently from the floor (to which the seats themselves were attached); passengers were rocked forward and backward while the carriage 'shoogled' them around. Passengers always entered at the middle of the train ("Q Here" signs were painted on the platforms), leaving by the front door of the front carriage or the rear door of the rear carriage.[18]

By the 1970s, the stations were very dilapidated. Surface access to most stations had been largely built into existing buildings and their entrances often formed part of shop frontages (Kelvinhall being the only surviving example of this in the post-modernised era), and with many of these structures being destroyed during the slum clearances of the 1960s, often only the station access was left standing. Stations were marked with circular signs often attached to lampposts. This sign had a white background in the top three-quarters (containing a large red letter "U") and black in the bottom quarter (containing the word "Underground" and an arrow to the station entrance). No station had an escalator; Kelvinbridge had a lift. Each station had a ticket office (often very small, little more than a booth with a window). The ticketing system was identical to that of most cinemas of the era, with tickets emerging from slots in the counters of the station ticket offices (the words "Control Systems Ltd" or "Automaticket Ltd" were printed on all tickets). Tickets were invariably collected on leaving the train. From the time of being taken over by the Corporation until 1977, the staff were issued with tramway uniforms; these were dark green and had a black braid on the cuffs which had been introduced at the time of the funeral of Queen Victoria in 1901.[19][20]

The Glasgow Museum of Transport had an area dedicated to the subway, with models showing the operation of the clutch-and-cable system, as well as a full-scale replica of part of a subway station, complete with different rolling stock of the pre-modernisation era.

Modernisation (1977–1980)

edit

By the 1970s, use of the Subway had declined significantly. This was caused partly by the closure of some of the dockyards and by widescale demolition of tenements south of the River Clyde. The original carriages, mostly dating back to 1896, were still in use, though adapted for electric traction in 1935. Breakdowns were becoming increasingly frequent; because trains could only be removed from the tracks to the depot by crane, a single inoperable train could cause major delays. The future of the Subway became a major issue for the Greater Glasgow Passenger Transport Executive (GGPTE), which took over responsibility for the line from Glasgow Corporation in the early 1970s. In January 1974 GGPTE announced a modernisation programme would be undertaken. The original plan would have seen trains continue to run on the system, with one of the two circles continuing to run while the other was upgraded. This idea was abandoned as expert advice suggested a safety risk.[21]

 
Partick station

On 24 March 1977, cracks were noticed in the roof of Govan Cross station, leading to suspension of services until 2 May. The service resumed with only four trains per circle. On 21 May 1977, the system was shut down eight days prematurely for a major refurbishment and modernisation; the date was brought forward because of the appearance of more cracks in the Govan Cross roof. Badly deteriorated tunnels were repaired; stations were rebuilt and enlarged, with additional platforms at Buchanan Street, Partick, Govan, Ibrox, Hillhead and St Enoch. The surface building of St George's Cross had already been rebuilt in 1971 as part of the construction of the Glasgow Inner Ring Road, and therefore was merely re-clad in the new corporate style. The entrance to Kelvinbridge was reversed, with a new entrance and car park built at South Woodside Road, an escalator to Great Western Road and stairs down to the west end of the platform; the former entrance and stairway at the east end became an emergency exit, and the lift was withdrawn from service. Merkland Street station was closed (thus becoming a ghost station); a new station to the north was built at Partick to provide an interchange with the North Clyde Line of the suburban rail system. The site of Merkland Street can be noticed by the characteristic hump and the larger-diameter tunnel with both tracks. Many fittings from Merkland Street were used to build a replica pre-modernisation station at the Glasgow Museum of Transport which contained three preserved cars.

A further interchange via moving walkway was installed between Buchanan Street station and Queen Street mainline station as part of the modernisation.

 
An Inner Circle train arrives at West Street station in 2004.

In August 1977, all redundant fittings and equipment from the old system were sold at a public sale at Broomloan Works. During the 1977–1980 modernisation, two Clayton battery locomotives were used by the contractors Taylor Woodrow to haul construction trains.[22]

Heavier track was installed although still at the unique 4 ft (1,219 mm) gauge, the original Broomloan Depot was modernised and equipped with connecting tracks with points to replace the crane transfer, and a new electrical supply from Westinghouse Electric Corporation was installed. A new ticketing system, provided by Crouzet, with passenger-operated ticket vending machines and automatic turnstile barriers, replaced the old, perforated cinema-style tickets and conductors. The post-1980 yellow tickets have since been replaced by a newer system, issuing magnetic stripe card tickets.

The modernised system uses automatic train operation with the driver only responsible for closing the doors pressing a "start" button in normal operation.[23]

While the system was closed a replacement bus service was introduced by GGPTE in a bid to retain customers. Service 66 covered the inner circle route, while service 99 covered the route taken by the outer circle.[21]

Since modernisation

edit
 
Map of the Glasgow Subway

The modernised Subway (alongside the rebuilt Argyle Line) was inaugurated by Queen Elizabeth II on 1 November 1979, who rode the train along with Prince Philip from Buchanan Street to St Enoch. Rebuilding work was however still incomplete, and the actual reopening to passengers did not occur until 16 April 1980. Thirty-three new carriages were built by Metro-Cammell at its Washwood Heath works in Birmingham, and equipped with GEC electric motors.[24][25] The exterior design of the trains was carried out in partnership with Glasgow School of Art, which, according to SPT publicity films of the day, was largely responsible for the trains' "cute" appearance. Eight additional centre-trailer carriages were built in 1992 (the body shells by Hunslet Gyro Mining Transport in Leeds for completion by Hunslet-Barclay in Kilmarnock), making all trains three carriages long. Smoking has never been permitted on the modernised system.

A new corporate identity was introduced (following contemporary fashions of the 1970s), with trains painted bright orange, stations largely rebuilt with dark brown bricks, orange-yellow wall tiles and other surfaces in off-white, plus brown uniforms for the staff. Large, illuminated orange "U" signs were placed at station entrances (since removed, with the re-adoption of the name "Subway"). Since the 1990s, ongoing renovation work has resulted in most stations adopting individual colour schemes. The trains' initial orange livery of 1980 (with a white stripe) was soon replaced by a darker, more durable shade of orange, later being replaced by SPT's carmine-red and cream livery.[citation needed]

The system was resignalled using Vital Processor Interlocking in 1996 and subsequently an upgraded Supervisory & Control System was installed.[26]

Further modernisation (2000s)

edit

A £40,000 study examining the feasibility of an expansion into the city's south side was conducted in 2005, and in 2007 Labour further committed to extend the line to the East End, but to no avail.[27]

New electronic destination signs were installed in the stations in 2008.

The Partick station modernisation project was completed in 2009, and resulted in a complete redevelopment at the station, which hosts a railway station, a subway station and a bus terminal on the outside.

In April 2010, Strathclyde Partnership for Transport approved outline plans for a £290 million upgrade of the Subway—the first since the comprehensive modernisation of the late 1970s.[28] Plans included additional safety measures, improved accessibility and smart technology such as electronic tickets.[29] The proposals were approved by the Scottish Government in March 2011, and changes to be brought in included:

  • integrated smartcard ticketing
  • new driverless trains
  • improved signalling with automation
  • refurbishing all subway stations, including making stations more accessible, as well as safer with platform screen doors.[30][31]

The first station to be modernised was Hillhead. This began in 2011 and finished in 2012. The work included the retiling of all the walls and floors, the replacement of escalators, a new ticket office, better way finding[clarification needed] and also a piece of public art.

Further plans were announced to modernise Ibrox and Kelvinhall stations before the 2014 Commonwealth Games in Glasgow. Furthermore, all other stations were planned to receive updated branding prior to modernisation work being carried out on them, so as to achieve unity in design.

In March 2016, Strathclyde Partnership for Transport (SPT) awarded contracts to Stadler and Ansaldo STS for the supply of 17 new driverless trains for the Subway.[32] The first was delivered in May 2019.[33] Testing on the Subway started on 5 December 2021.[34] The first new trains were previously expected to operate in 2022.[35] The first passenger service with the new trains operated on 11 December 2023,[36] with the third generation trains fully replacing the second generation after their withdrawal on 28 June 2024.[37]

Future development and Clyde Metro

edit
 
Kelvinhall subway station, showing previous signage

The Glasgow Subway system is the only metro system never to have been expanded from its original route in 125 years, although a report published in 2018 summarised various extension plans from 1937 onwards.[38]

In early 2005, SPT announced that they would employ consultants to look into extending the system in the West End, East End, South Side and Glasgow Harbour areas of the city. The extension would take advantage of existing unused tunnels underneath the city, and there is a possibility that roads would be dug up to install tunnels before being replaced and resurfaced (cut-and-cover tunnelling).

On 14 March 2007, SPT announced the plans that the consultants had recommended. These included major refurbishment of the existing rolling stock and stations, at an overall cost of £270 million.[39] The expansion of the existing network was also considered at a cost of £2.3 billion, including a new East End Circle, with seven new stations at St Mungo's, Onslow, Duke Street, Celtic Park, Dalmarnock, Newhall and Gorbals. The aim was to improve transport links in an area of the city which is currently poorly served by rail, in the hope that this would aid regeneration, and the city's 2014 Commonwealth Games bid. This circle would interchange at Cowcaddens, Buchanan Street and St Enoch. Other proposals include extending the system southwards to Cathcart and further westwards to the SEC Centre and Maryhill using an older railway line.

In 2007, SPT produced a report that showed huge support for a Subway extension. Councillor Alistair Watson of the SPT stated:

We want what you want. This city needs a world-class Subway system. That's what our passengers deserve. I realise an extension won't come cheap and we still have lots of hurdles to overcome but, in my view, what the public wants, the public should get. This is a ringing endorsement from the people who would use the extended Subway.[40]

The plans were expected to take twelve years[citation needed], but never came to fruition.

Crossrail Glasgow proposals[41] by Glasgow City Council featured a feasibility study conducted by SPT, which included a proposed new West Street railway station which would interface with the West Street station on the Subway network.

 
Proposed alignment for the Glasgow Airport Rail Link

The Glasgow Connectivity Commission, established by Glasgow City Council in 2017, has also suggested a Glasgow Metro. This would involve repurposing or reopening existing heavy rail lines, the creation of additional light rail metro, and the construction of an airport rail link.[42][43]

Clyde Metro

edit

In 2022, Transport Scotland published its final version of the Strategic Transport Projects Review 2,[44] which outlines proposals for the Clyde Metro. The Clyde Metro proposals retain the Subway, and also note the potential for a new station at West Street.

Connections

edit

Before the 1970s modernisation, the Subway offered no formal connections to other transport at ground level, although in practice two stations, Merkland Street and Buchanan Street, were only a short walk from British Rail stations. These links were improved at this modernisation:

Stations

edit

Rolling stock

edit

First generation (1896–1977)

edit
 
First generation rolling stock

The first rolling stock was largely built in 1896,[45] with additional trailer carriages added over the following 20 years. This rolling stock was converted from cable to electric traction in 1935 and finally withdrawn from service in 1977 upon the closure of the railway for modernisation.[46][47][48]

Second generation (1980–2024)

edit
 
Second generation Metro Cammell rolling stock

The first 33 cars of the second generation fleet were built by Metro-Cammell, Washwood Heath between 1977 and 1979.[24][25] Eight additional trailer cars were built in 1992.[47] The rolling stock entered service when the subway re-opened after modernisation work on 16 April 1980.[48] The original 33 were refurbished by ABB at Derby Litchurch Lane Works in 1995.[49] The second generation fleet was entirely retired from service on 28 June 2024.[50]

Third generation (2023–present)

edit
 
Third-generation Stadler unit at West Street

Strathclyde Partnership for Transport (SPT) unveiled a £200M contract with Stadler and Ansaldo STS in 2016 for modernisation of the Subway, including new driverless rolling stock. These trains were expected to enter service after the modernisation completed in 2020; however the trains entered passenger service in December 2023.[51] The trains were built by Stadler Rail at their factory in Altenrhein in eastern Switzerland.

Fares and ticketing

edit
 
A new ITSO paper 'disposable' smartcard Subway ticket, with rebranding compared to old style magnetic strip paper ticket

The Glasgow Subway uses a flat-fare structure rather than a distance-based fare structure. A ticket allows passengers to stay on the Subway for as long as they like.

Tickets are sold as paper tickets, or electronically on a Subway Smartcard. Smartcard ticket prices are discounted slightly from paper ticket prices, and feature a daily cap lower than the paper return ticket and significantly cheaper than the paper all-day ticket. A smartcard is required for any form of season ticket (seven days, four weeks, six months or one year).[52]

Smartcards are available online for free, or for £3 from stations.[52]

All tickets are available at any station either through a machine or at the ticket office. Tickets must be 'tapped' on the card reader to validate the ticket and must be retained for exit.[53]

SPT's Zonecard is also valid on the Subway as long as it is valid in zones G1 or G2.[54]

The concession fare is for disabled or elderly individuals who are holders of a National Entitlement Card that has been issued by SPT.[55]

Services

edit

The Subway runs from 06:30 to 23:40 Monday to Saturday and 10:00 to 18:12 on Sunday. Trains run every 6–8 minutes during off-peak periods on both Inner (Anti-Clockwise) and Outer (Clockwise) services.

iShoogle

edit

In September 2012 SPT launched an app for Apple iPhones and Android smartphones called iShoogle which allows users to "Check in" using Facebook at Subway stations. Shoogle guide does a search of local area amenities such as bars, shops, cafes, banks and entertainment that are near subway stations, there are local area maps using Apple Maps or Google Maps as well as the official SPT map and timetables of the first and last trains and photos from SPT's archives. The app also has facts about the Subway.[56][57][58]

Cultural references

edit

Nicknames

edit
 
Cowcaddens subway station

The origin of the Subway's supposed, but seldom used outside the press, nickname, "The Clockwork Orange" (coined from the title of the book and film A Clockwork Orange) is subject to dispute. Some believe that it was originally coined by the media of the period, while others credit it to the then chairman of British Rail, Sir Peter Parker, who was quoted in a late 1970s publicity video of the new trains as saying "so these are the original Clockwork Orange".[59] Most of its carriages were painted orange (although called "Strathclyde PTE red" because "Orange" has sectarian connotations in Glasgow), the corporate colour of Greater Glasgow Passenger Transport Executive at the time.

While the "Clockwork Orange" nickname is often used in tourist guidebooks and local literature, it is virtually unused by locals,[60][61][62] who will refer to the system simply as "the Subway" or "the Underground".

Prior to the introduction of new trains in the 1970s, the name "Shoogly Train" ("shoogly" meaning "shaky" in the Scots language[63]) was used because the design of the cars allowed a degree of movement or "shoogle" between the backrest and squab of each seat.[64]

"The Underground Song"

edit

The celebrated Glaswegian writer and broadcaster Cliff Hanley composed a satirical song about the pre-modernisation era Subway entitled "The Underground Song". It was popular as a stage piece performed by the comedians Rikki Fulton and Jack Milroy in their Francie and Josie act.[65]

The chorus of the song is:

There's Partick Cross and Cessnock, Hillhead and Merkland Street,
St George's Cross and Govan Cross where all the people meet;
West Street, Shields Road – The train goes round and round;
You've never lived unless you've been on the Glasgow Underground.[65]

The Subcrawl

edit

The Glasgow Subway and its adjacent public houses are the focal point of a pub crawl known as the Subcrawl. Participants buy an all day ticket, disembark at each of the 15 stations and have a drink in the nearest bar.[66]

See also

edit

References

edit
  1. ^ "Passenger journeys on light rail, trams and undergrounds by system: Great Britain - annual from year ending March 1984" (downloadable .ods OpenDocument file). Department For Transport. Retrieved 18 October 2024.
  2. ^ "Glasgow Subway | SPT | Corporate Information | Strathclyde Partnership for Transport". Strathclyde Partnership for Transport. Archived from the original on 21 February 2019. Retrieved 15 December 2018.
  3. ^ "Broomloan Road workshops". theglasgowstory.com. Archived from the original on 26 September 2020.
  4. ^ "LRT0101: Passenger journeys on light rail and trams and undergrounds by system: Great Britain – annual from 1983/84" (downloadable .ods OpenDocument file). Department for Transport. 24 August 2022.
  5. ^ "Police For Glasgow Subway". The Times. 3 January 2007.
  6. ^ "The Evening News". Edinburgh Evening News. Scotland. 14 December 1896. Retrieved 4 February 2017 – via British Newspaper Archive.
  7. ^ "Subway – History". Strathclyde Partnership for Transport. Archived from the original on 20 August 2006.
  8. ^ a b c d Casely, Gordon; Hamilton, Bill (1976). I belong to Glasgow – The human history of the Glasgow Underground (2 ed.). Glasgow: Nexus Press Ltd.
  9. ^ "A collision under the Clyde". Yorkshire Evening Post. England. 15 December 1896. Retrieved 4 February 2017 – via British Newspaper Archive.
  10. ^ Irlam, Michael J. "A Scottish District Subway". Mike's Railway History. Archived from the original on 10 May 2008. Retrieved 10 January 2007.
  11. ^ "Subway – History". Strathclyde Partnership for Transport. Archived from the original on 22 May 2007.
  12. ^ "Subway – History". Strathclyde Partnership for Transport. Archived from the original on 21 May 2007.
  13. ^ "Glasgow Corporation's Venture. Taking over the Subway Railway". Dundee Courier. Scotland. 20 March 1923. Retrieved 4 February 2017 – via British Newspaper Archive.
  14. ^ a b UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 7 May 2024.
  15. ^ "Electrification of Subway: Official Inspection". The Scotsman. Scotland. 27 March 1935. Retrieved 4 February 2017 – via British Newspaper Archive.
  16. ^ "Last Cable Drawn Car". Falkirk Herald. Scotland. 4 December 1935. Retrieved 4 February 2017 – via British Newspaper Archive.
  17. ^ a b Anderson, Keith (2014). Glasgow Underground:The Glasgow District Subway. Stroud, Gloucestershire: Amberley. p. 33. ISBN 978-1-4456-2174-6.
  18. ^ Paws, Big (3 February 2018). "Trackside Classic: 1896 Glasgow Subway Car No. 1 – Simply Different". Archived from the original on 22 July 2020. Retrieved 22 July 2020.
  19. ^ "Subway – Chronology". spt.co.uk. Archived from the original on 7 July 2007.
  20. ^ "Glasgow Transport Memorobilia". glasgowtransport.co.uk. Archived from the original on 17 April 2007. Retrieved 31 January 2007.
  21. ^ a b Anderson, Keith (2014). Glasgow Underground: The Glasgow District Subway. Stroud, Gloucestershire: Amberley. p. 44. ISBN 978-1-4456-2174-6.
  22. ^ "Subway replacement battery locomotives" (PDF). Strathclyde Partnership for Transport. 13 June 2008. Archived from the original (PDF) on 2 June 2016.
  23. ^ "Glasgow Subway Automatic Train Operation" (PDF). Institute of Railway Signal Engineers. January 2006. Archived from the original (PDF) on 28 August 2019.
  24. ^ a b "Order placed for Glasgow's tube stock". Railway Gazette International. March 1975. p. 88.
  25. ^ a b "Glasgow Underground coaches ordered". The Railway Magazine. No. 888. April 1975. p. 159.
  26. ^ Gerrard, Ed; Chaffe, David; Peat, Watson (September–October 2007). "Upgraded Supervisory and Control System brings Operational & Maintenance Benefits to Glasgow Subway" (PDF). IRSE Newsletter, Hong Kong Section. 33: 1–3. Archived (PDF) from the original on 21 July 2011. Retrieved 13 April 2010.
  27. ^ "SPT Interchange Issue 9". Strathclyde Partnership for Transport. July 2005. Archived from the original on 12 June 2007.[needs update]
  28. ^ "SPT approves £290m modernisation of the Subway, 16 April 2010". BBC News. 16 April 2010. Archived from the original on 12 March 2011. Retrieved 10 August 2011.
  29. ^ "Subway Modernisation – SPT". Strathclyde Partnership for Transport. Archived from the original on 20 June 2016. Retrieved 7 November 2018.
  30. ^ "SPT Projects – Subway Modernisation". Strathclyde Partnership for Transport. 15 April 2011. Archived from the original on 30 October 2012. Retrieved 10 August 2011.
  31. ^ "Glasgow's subway system prepares for a new age". The Scotsman. 16 November 2015. Archived from the original on 30 November 2020.
  32. ^ "New Trains Unveiled". Strathclyde Partnership for Transport. 4 March 2016. Archived from the original on 20 June 2016. Retrieved 28 June 2016.
  33. ^ "First driverless Glasgow subway train delivered". Metro Report International. 7 May 2019. Archived from the original on 10 May 2019.
  34. ^ "New Glasgow Subway train put to the test". BBCNews. 17 December 2021. Retrieved 19 July 2023. 
  35. ^ "'Confrontational' talks as Glasgow Subway driverless trains delayed to 2022". The Scotsman. 11 December 2020.
  36. ^ "Passengers experience first glimpse of new Subway trains". Strathclyde Partnership for Transport. 11 December 2023.
  37. ^ "Glasgow says goodbye to old subway trains". BBC News. 28 June 2024.
  38. ^ Williams, Craig (9 February 2018). "The plans for 50 new Glasgow Subway stations and where they were going to be". glasgowlive. Archived from the original on 9 June 2020. Retrieved 1 June 2020.
  39. ^ "News". Evening Times. 14 March 2007. Archived from the original on 9 August 2011. Retrieved 10 August 2011.
  40. ^ "Survey shows SPT 'in tune' with the public". Strathclyde Partnership for Transport. Archived from the original on 3 September 2017. Retrieved 2 September 2017.
  41. ^ "Glasgow Crossrail – Report by Executive Director of Development and Regeneration Services". Glasgow City Council. Archived from the original on 17 January 2023. Retrieved 17 January 2023.
  42. ^ "Connectivity Commission". Glasgow City Council. 29 November 2018. Archived from the original on 29 November 2018. Retrieved 30 April 2019.
  43. ^ "Plans for a Glasgow Metro network and Central-Queen Street tunnel unveiled". HeraldScotland. 29 April 2019. Archived from the original on 29 April 2019. Retrieved 29 April 2019.
  44. ^ "Final technical report – December 2022 – STPR2".
  45. ^ "On this day in 1896: The Glasgow Subway opens". www.scotsman.com. Archived from the original on 15 January 2018. Retrieved 12 February 2018.
  46. ^ "1970s Modernisation | Shoogle Club". Strathclyde Partnership for Transport. Archived from the original on 13 February 2018. Retrieved 12 February 2018.
  47. ^ a b "Glasgow Subway". Strathclyde Partnership for Transport. Archived from the original on 21 February 2019. Retrieved 12 February 2018.
  48. ^ a b Gilbert, Julie (3 September 2017). "A clockwork orange – How the Glasgow Subway has changed through the decades". glasgowlive. Archived from the original on 13 February 2018. Retrieved 12 February 2018.
  49. ^ "ABB wins Clockwork Orange order". The Railway Magazine. No. 1107. July 1993. p. 17.
  50. ^ "Subway carriages retire after 44 years of service". BBC News. 29 June 2024. Retrieved 1 July 2024.
  51. ^ Williams, Craig (24 July 2022). "Inside Glasgow Subway's driverless trains as new video released by SPT". glasgowLive.co.uk. Retrieved 16 August 2022.
  52. ^ a b "Subway Smartcard". Strathclyde Partnership for Transport. 19 December 2013. Retrieved 15 January 2023.
  53. ^ "SPT Subway Smartcard". Strathclyde Partnership for Transport. Archived from the original on 22 November 2013. Retrieved 6 January 2014.
  54. ^ "ZoneCard". Archived from the original on 1 February 2014. Retrieved 6 January 2014.
  55. ^ "Concessions". Archived from the original on 26 October 2016. Retrieved 25 October 2016.
  56. ^ "SPT launches pioneering mobile app". Strathclyde Partnership for Transport. 25 September 2012. Archived from the original on 14 April 2013. Retrieved 25 September 2012.
  57. ^ "iShoogle The shoogle guide to Glasgow". Google Play. 25 September 2012. Archived from the original on 18 December 2013. Retrieved 25 September 2012.
  58. ^ "iShoogle for iPhone 3GS, iPhone 4, iPhone 4S". itunes store. 25 September 2012. Archived from the original on 16 March 2014. Retrieved 25 September 2012.
  59. ^ "Glasgow Transport 1980 – Part 2, Glasgow Underground". YouTube. 30 January 2007. Archived from the original on 25 April 2020. Retrieved 10 August 2011.
  60. ^ "The Cable Car Home Page – Cable Car Lines in the UK". Cable-car-guy.com. Archived from the original on 6 August 2011. Retrieved 10 August 2011.
  61. ^ "Racing a clockwork orange". MetaFilter. Archived from the original on 6 June 2011. Retrieved 10 August 2011.
  62. ^ "Glasgow Guide: Pots And Pans Hen Night – Glasgow Guide Boards". Discuss.glasgowguide.co.uk. Archived from the original on 14 August 2011. Retrieved 10 August 2011.
  63. ^ "Dictionaries of the Scots Language:: SND :: shoggle".
  64. ^ "iShoogle – Android Apps on Google Play". Archived from the original on 18 December 2013. Retrieved 23 April 2013.
  65. ^ a b "Francie and Josie – Glasgow Underground". 6 December 2011. Archived from the original on 22 June 2016. Retrieved 27 November 2016 – via YouTube.
  66. ^ "Glasgow sub-crawl: a pub crawl via the city's underground". The Guardian. 30 November 2012. Archived from the original on 3 January 2017.

Further reading

edit
  • Wright, J.; Maclean, I. (1997). Circles under the Clyde: A history of the Glasgow Underground. Capital Transport. ISBN 1-85414-190-2.
  • Hunt, John (4–17 June 1997). "Running like clockwork!". RAIL. No. 306. EMAP Apex Publications. pp. 30–34. ISSN 0953-4563. OCLC 49953699.
  • Watson, G. (2013). Glasgow Subway Album. George Watson. ISBN 978-1-906311-06-3.
  • Bruce, W.R. (1936). Thomas, P.W. (ed.). Electrification of the Glasgow District Subway (Book). Transactions, the Institution of Engineers and Shipbuilders in Scotland. Vol. 79. Glasgow, UK: IESIS. p. 131.
  • Thomson, D. L.; D. E. Sinclair (1964). The Glasgow Subway. Scottish Tramway Museum Society.
edit
KML is from Wikidata
  NODES
Idea 1
idea 1
INTERN 2
Note 2
Project 3
USERS 1