Leigh-Salford-Manchester Bus Rapid Transit

The Leigh-Salford-Manchester Bus Rapid Transit service in Greater Manchester, England provides transport connections between Leigh, Atherton, Tyldesley, Ellenbrook and Manchester city centre via Salford. The guided busway and bus rapid transit (BRT) scheme promoted by Transport for Greater Manchester (TfGM) opened on 3 April 2016. Built by Balfour Beatty at a total cost of £122 million to improve links from former Manchester Coalfield towns into Manchester city centre, the busway proposal encountered much opposition and a public enquiry in 2002 before construction finally started in 2013. A branch route from Atherton, and an extension to the Manchester Royal Infirmary have been added to the planned original scheme.

Leigh-Salford-Manchester Bus Rapid Transit
Route V1 in the original Vantage branding, at Newearth Road bus stop on the guided busway section.
Route V1 in the original Vantage branding, at Newearth Road bus stop on the guided busway section.
Overview
OwnerTransport for Greater Manchester
LocaleWigan
Salford
Manchester
Transit typeGuided busway and Bus rapid transit
Annual ridership2.6 million (2023/24)
WebsiteTfGM - V1/V2/V4 services
Operation
Began operation3 April 2016
Operator(s)Go North West (under the Bee Network)[1]
Technical
System length22 kilometres

From Leigh, the V1 limited-stop bus service joins seven kilometres of guided busway to Ellenbrook, six kilometres of bus lanes on the East Lancashire Road and sections of reserved bus lanes through Salford and Manchester city centres. The V2 service from Atherton to Manchester joins the guided busway at Tyldesley. Stops on the guided busway section have level-boarding from platforms equipped with passenger information display screens. Both services run via the University of Manchester and Manchester Metropolitan University before terminating at Manchester Royal Infirmary.[2]

From from 24 September 2023 all services along the Bus Rapid Transit route were integrated into the first tranche of the 'Bee Network', an overall bus franchising scheme intended as a component of an eventual integrated transport network for the whole of Greater Manchester. Consequently, the Rapid Transit bus operation has been transferred to Go North West, the vehicles have been repainted with the yellow 'Bee Network' branding, and day tickets are valid for all bus journeys across the Network.

Background

edit

Leigh, one of the largest towns in Britain without a railway station after the closure of the Tyldesley Loopline in 1969, suffered from poor transport connections to neighbouring towns. A guided busway running over a kerbed concrete track was proposed, reusing the former railway trackbed from Leigh to Ellenbrook to improve access to Manchester city centre from Leigh, Tyldesley and Ellenbrook and regenerate areas of the former Manchester Coalfield.

There was considerable opposition to the proposals; variously arguing that the costs were unjustifiable, that buslane construction on the A580 East Lancashire Road would seriously disrupt traffic and that the permanent loss of a traffic lane to a buslane would reduce capacity for general traffic. In addition, rail campaign groups opposed the loss of a rail alignment to a busway.

Route

edit
 
Cooling Lane stop on guided section and multi-user path
Leigh-Salford-Manchester
Bus Rapid Transit
Bag Lane
 
 
Leigh bus station  
Mealhouse Lane
 
 
Spinning Jenny Way
for The Loom
Tyldesley Road
Atherton Arms
 
 
 
East Bond Street Park & Ride
 
130
 
 
Tyldesley Road
Sacred Heart Church
 
 
Holden Road
 
 
Atherton
Tyldesley
 
 
Leigh
Tyldesley
 
 
Stanley Street
Tyldesley Town Centre
 
 
Higher Folds
West Cooling Lane
 
 
 
Astley Street Park & Ride
 
45
 
 
Hough Lane
 
Sale Lane
Tyldesley
Ellenbrook
 
 
 
 
Newearth Road
 
 
Newearth Road
at East Lancs Road
Ellenbrook
Worsley
 
 
 
 
 
 
Walkden Road
on East Lancs Road
 
 
 
 
 
Old Clough Lane
on East Lancs Road
Worsley
Wardley
 
 
 
 
 
 
Park & Ride
on East Lancs Road
 
250
Wardley
Swinton
 
 
 
 
 
 
Moorside Road
on East Lancs Road
 
 
 
 
Worsley Road
on East Lancs Road
 
 
 
 
 
Barton Road
on East Lancs Road
Swinton
Pendleton
 
 
 
 
 
 
 
Pendleton Church
Pendleton
Salford
 
 
 
 
 
University of Salford
Frederick Road Campus
 
 
 
 
 
Salford Crescent station  
 
 
University of Salford
Peel Park Campus
 
 
 
 
University of Salford
Adelphi House
 
 
 
 
Salford Cathedral
 
 
 
Salford Central station  
Salford
Manchester bus-gate
 
 
 
Bridge Street
for Deansgate
 
John Dalton Street
 
Albert Square
 
   St. Peter’s Square
 
Princess Street
 
 
 
 
Portland Street
 
 
 
Oxford Road station  
 
 
Route no longer in use
 
 
 
 
  Piccadilly Gardens
 
 
 
MMU
John Dalton Building
 
 
 
Stevenson Square
 
 
 
MMU
All Saints Campus
 
 
Manchester Museum
 
 
University of Manchester
 
 
Whitworth Art Gallery
 
 
 
Manchester Royal Infirmary [3]
Key
Street running
 
 
Guideway running
with bus lane(s)[4][5]
 
 
 
n
Park & Ride
with n spaces

The BRT route begins at Leigh bus station, and joins the guided section at East Bond Street. It proceeds through Leigh and along the converted rail alignment via Tyldesley to Newearth Road in Ellenbrook. An improved bus route from Atherton joins the route at Astley Street, Tyldesley. From Ellenbrook the route continues via bus lanes alongside the A580 East Lancashire Road, serving Worsley and Swinton before joining the A6 at Irlams o' th' Height. All stops along the A580 bus lanes are bus bays so that conventional stopping services can be overtaken by limited-stop expresses. The service passes the University of Salford/Salford Crescent railway station and the route then runs along Chapel Street on buslanes to Salford Central station, passing through a bus-gate before continuing through Manchester city centre and along buslanes on Oxford Road to Manchester Metropolitan University, Manchester University and the Central Manchester Hospitals.[6][7]

The guided section has stops at East Bond Street, Holden Road in Leigh and Cooling Lane between Higher Folds and Squires Lane in Tyldesley, Astley Street, Hough Lane and Sale Lane in Tyldesley and Newearth Road in Ellenbrook. The multi-user path for walkers, horse riders and cyclists alongside the guided section provides access for emergency vehicles and maintenance.[8] For cyclists the path from Tyldesley to Ellenbrook is part of the National Cycle Network Route 55.[9]

The route from Leigh to Central Manchester Hospitals has 36 stops and the connecting route from Tyldesley to Atherton has five.[3] Park and ride facilities are provided at East Bond Street, Astley Street and Wardley (accessed from the A580, where the road passes under the M60 motorway).[10]

Services

edit

Service V1 operates from Leigh and V2 from Atherton; with additional V4 services from Ellenbrook in the weekday morning peak period that do not use the guided section of the route.[11] Timetabled journey times are 60 minutes from Leigh and Atherton to Albert Square, Manchester at peak periods; 51 minutes daytime off-peak and 40 minutes in evenings, overnight and early mornings. In peak periods, the services from the Wardley, A580 Park and Ride take 31 minutes into Albert Square. [12] In daytime operation from Monday to Saturday at least eight buses per hour run in each direction on the guided section, four on the Leigh to Tyldesley section and four from Atherton joining the Tyldesley to Ellenbrook section.[13]

From 1 September 2024, V1 services have run round the clock and every day of the week, with night-time services at hourly frequencies. Two additional V1 services run from Leigh into Manchester in the weekday morning peak; three additional services return to Leigh in the weekday evening peak. Four V4 services run into Manchester in the morning peak, starting from Ellenbrook. [12]

Operation

edit
 
V1 bus on the guided busway
 
V2 bus in Bee Network branding crossing tramlines in St Peter's Square in Manchester city centre

After light-controlled junctions along the East Lancashire Road were upgraded with SCOOT adaptive signalling in July 2016, TfGM reported that October that general road traffic journey times on this section had returned to pre-construction levels in the morning peak while accommodating significant additional traffic.[14]

In the first six months of operation, more than 900,000 passenger journeys were made. A survey of users published in October 2016 revealed that 20% of passengers had switched from using their cars for the same journey, and nearly all respondents would recommend the service.[15][16] More than a quarter of busway users walked or travelled more than a kilometre to reach the busway.[17] By the third year of operation, it was being estimated that 580,000 car trips per year along the BRT route had transferred to bus ridership.[18]

The service attracted about 28,000 passengers per week when it started in April 2016 rising to 45,000 by the autumn and 55,000 in the run up to Christmas 2016.[19] In the first year more than 2.1 million passengers were carried; increasing to approximately 2.6 million in the second,[20] and 3 million in the third.[18] By December 2017, weekly ridership had increased to 62,000.[21] This further increased to a record 71,626 weekly passengers in December 2019.[22]

BRT services were curtailed and patronage sharply reduced in 2020 and 2021 during the COVID-19 pandemic; but have since recovered to a total annual ridership of 2.6 million in the financial year 2023/24, and continue to increase.

Buses

edit

Services were initially operated by 20 Wright Eclipse Gemini 3 bodied Volvo B5LH hybrid double-decker buses in purple-livery. These were equipped with CCTV and next stop audio and visual announcements, USB charging points and free Wi-Fi.[23] Five more buses were purchased in January 2017 to provide extra capacity at busy times and facilitate the extended service to Central Manchester Hospitals.[24][25] Further buses entered service in September 2018 to operate the V4 service from Ellenbrook, as standard vehicles not adapted for busway running.[26]

In February 2019, TfGM were successful in bidding for funding support in buying an additional 10 electric buses for busway operation, to enter service in March 2020.[27] These are Alexander Dennis Enviro400 MMC double-deckers with BYD Company battery power. TfGM intend that eventually all Vantage services will be operated by electric buses; to be purchased and owned by TfGM themselves, rather than by the service operator. Five of the existing fleet of Volvo B5LH buses were be transferred to other services in Greater Manchester; and so total busway-equipped fleet increased to 30, allowing extra daytime frequency on V1 services from Leigh.[28]

In 2023, under Tranche 1 of Bee Network, the existing fleet were passed from First Greater Manchester to Go North West. Under Go North West, a fleet of MCV EvoSeti bodied Volvo B5LH, originally from Go Ahead London and having the middle set of exit doors removed and replaced by window and seats, were deployed on the BRT routes. These buses, along with the original fleet have gradually been repainted to Bee Network yellow.

Stops, signalling and ticketing

edit

Stops along the guided busway section provide level-boarding from platforms and are equipped with passenger information display screens. The guided busway crosses local roads on level, light-controlled junctions at which busway services have priority.[29]

Awards

edit

The scheme won the Transport Policy, Planning and Implementation award at the Chartered Institute of Logistics and Transport North West Awards[14] and the award for sustainability at the 10th annual North West Construction Awards in 2016.[30] The launch of the Vantage service won the Transport Project of the Year category and the Leigh to Ellenbrook Guided Busway section was the winner in the Construction and Engineering category at the National and the North of England Transport Awards in December 2016.[31] Greater Manchester's Bus Priority Package won the National Transport Award for improvements to bus services in October 2017.[32]

History

edit

Planning

edit

A long legal process preceded the busway's construction, including a public inquiry in 2002.[33] The decision of the public inquiry was delayed because of great crested newts occupying a site on the route. The Department for Transport granted powers to build the busway in 2005 and it was projected to be built by 2009 but preliminary work only started in 2012.[34] Powers to build it are set out in the Greater Manchester (Leigh Busway) Order 2005 in the Transport and Works Act.[35] The Greater Manchester Passenger Transport Executive estimated in 2005 that the busway would generate around 2 million passenger trips per annum.[36] After the public inquiry, a branch bus route from Atherton to Tyldesley and an extension from Manchester city centre to the Manchester Royal Infirmary were added to the scheme.

Construction

edit

Site clearance for the dedicated busway section between Leigh and Ellenbrook took place between November 2012 and March 2013.[37] TfGM spent £122 million on bus priority investment of which the guided busway track and infrastructure cost £68 million and the rest was spent upgrading associated local roads, bus lanes and junctions. The Greater Manchester Transport Fund provided most of the funding and the Department for Transport contributed £32.5 million.[23]

Integration with other services

edit
 
V2 bus in Bee Network branding passing through the Bridge Street bus-gate between Manchester and Salford

From 24 September 2023, the busway became part of the Bee Network, a London-style integrated transport system.[38][39]

In July 2024, the Greater Manchester Combined Authority published its 'Draft GM Rapid Transit Strategy' proposing priority schems for expansion of rapid transit of all forms across Greater Manchester, up to the year 2040. This states that "The Leigh–Salford–Manchester Busway is another clear example of our successful approach to rapid transit in action, carrying over two and a half million journeys per year and removing the need for around half a million car journeys"; and proposes this as a model that might be considered for other parts of the Greater Manchester conurbation, especially for serving Manchester Airport and the proposed growth area of the 'Atom Vally' between Bury and Rochdale . The Strategy proposes that, as BRT demand is expected to continue to grow, so frequencies along this busway should be increased; and also that an additional stop should be provided on the guided section to serve new residential developments in Mosley Common south of Tyldesley.[40]

References

edit
  1. ^ "V1 Timetable (Bee Network - Go North West)". Retrieved 11 December 2023.
  2. ^ Vantage route map, retrieved 11 September 2018
  3. ^ a b Stopping Places, First Greater Manchester, retrieved 27 April 2017
  4. ^ "Better journeys on the East Lancashire Road (A580)" (PDF). Transport for Greater Manchester. January 2014. Retrieved 22 October 2018.
  5. ^ "Permanent changes to Oxford Road". Transport for Greater Manchester. Retrieved 22 October 2018.
  6. ^ Busway – Route, Transport for Greater Manchester, archived from the original on 21 October 2013, retrieved 7 August 2013
  7. ^ Bus Priority Package (PDF), Transport for Greater Manchester, retrieved 13 January 2016
  8. ^ Busway path completed, Leigh Journal, 5 May 2016, retrieved 19 May 2016
  9. ^ Route 55 Map Sustrans, Sustrans, retrieved 19 May 2016
  10. ^ Manchester Confidential "Confidential Publishing". Archived from the original on 16 March 2015. Retrieved 11 March 2015.
  11. ^ extra buses to run on vantage busway during rush hour, FirstGroup, retrieved 8 August 2018
  12. ^ a b V1, V2, V4 Timetables, retrieved 1 October 2024
  13. ^ Improving bus connections between Leigh, Salford and Manchester (PDF), Transport for Greater Manchester, 3 December 2011, archived from the original (PDF) on 4 March 2016, retrieved 31 October 2015
  14. ^ a b Busway priority update, Transport for Greater Manchester, 14 October 2016, retrieved 30 November 2016
  15. ^ Our survey says…the busway is a hit with passengers, Transport for General Manchester, 6 October 2016, retrieved 7 October 2016
  16. ^ Busway operational update, Transport for General Manchester, 18 November 2016, retrieved 11 November 2016
  17. ^ Presentation to BRT UK (PDF), Transport for General Manchester, 16 September 2016, retrieved 27 March 2017
  18. ^ a b Multi-million milestone for busy busway, Transport for General Manchester, 3 April 2019, retrieved 19 February 2020
  19. ^ Bus Priority Update February 2017, Transport for General Manchester, 10 February 2017, retrieved 3 February 2017
  20. ^ Bus Priority Update April 2018, Transport for General Manchester, 13 April 2018, retrieved 5 April 2018
  21. ^ Mayor sets out major transport overhaul, Transport for General Manchester, 13 December 2017, retrieved 5 April 2018
  22. ^ Record breaking figures for Vantage, Transport for General Manchester, 18 December 2019, retrieved 19 July 2021
  23. ^ a b Busway begins, Bus & Coach Buyer, 5 April 2016, retrieved 6 April 2016
  24. ^ "Service Changes in Leigh, Atherton and Tyldesley". FirstGroup. Retrieved 22 January 2017.
  25. ^ Extra buses added to cope with guided busway demand, Leigh Journal, 28 September 2016, retrieved 28 September 2016
  26. ^ "Vantage Busway gains extra buses from September" Coach & Bus Week issue 1354 7 August 2018 page 13
  27. ^ "TfGM Ultra Low Emission Bus Scheme Bid Submission" (PDF). Retrieved 14 October 2018.
  28. ^ "TfGM Ultra Low Emission Bus Scheme". Retrieved 6 February 2019.
  29. ^ "Positive reviews following "teething problems" for new guided busway", Leigh Journal, Newsquest Media Group, 7 April 2016, retrieved 7 April 2016
  30. ^ The North West Regional Construction Awards 2016, North West Regional Construction, retrieved 30 November 2016
  31. ^ North of England Transport Awards winners announced, Transport Times, 8 December 2016, retrieved 1 February 2017
  32. ^ Inspiring transport projects rewarded at National Transport Awards ceremony, Transport Times, 13 October 2017, retrieved 29 October 2017
  33. ^ Leigh Busway Inspector's Report (PDF), Transport for Greater Manchester, archived from the original (PDF) on 3 March 2016, retrieved 6 April 2016
  34. ^ Leigh Salford Manchester Busway Project (PDF), brtuk.org, archived from the original (PDF) on 20 May 2013, retrieved 7 August 2013
  35. ^ The Greater Manchester (Leigh Busway) Order 2005 (PDF), Legislation.gov.uk, retrieved 6 April 2016
  36. ^ Vaughan, Nick, The Leigh-Salford_Manchester Busway Project (PDF), retrieved 25 September 2016
  37. ^ Construction work, Transport for Greater Manchester, archived from the original on 19 October 2013, retrieved 7 August 2013
  38. ^ Lythgoe, George (30 December 2022). "Major changes coming to Leigh Guided Busway for 2023". Manchester Evening News. Archived from the original on 14 January 2023. Retrieved 14 January 2023.
  39. ^ @OfficialTfGM (23 December 2022). "Greater Manchester's vision for a truly integrated public transport network" (Tweet) – via Twitter.
  40. ^ Transport Plans to meet growth ambitions unveiled, Transport for Greater Manchester, retrieved 30 September 2024
edit
  NODES
Note 1
Project 5
twitter 1
USERS 2