This article includes a list of general references, but it lacks sufficient corresponding inline citations. (April 2020) |
You can help expand this article with text translated from the corresponding article in Hungarian. (April 2020) Click [show] for important translation instructions.
|
The M25 expressway (Hungarian: M25-ös autóút) is a short north–south highway in Hungary. It connects the M3 motorway to the city of Eger.
M25 expressway | |
---|---|
M25-ös autóút | |
Route information | |
Length | 19 km (12 mi) |
Existed | 2018–present |
Major junctions | |
From | M3 near Füzesabony |
To | 252 in Eger |
Location | |
Country | Hungary |
Counties | Heves |
Major cities | Eger |
Highway system | |
|
Timeline
editSection | Length | Opened | Notes |
---|---|---|---|
Kál (M3) – Andornaktálya | 14.5 km (9.01 mi) | 20 July 2020 | Segment South, built between 2018 – 2020. |
Andornaktálya – Eger | 4.0 km (2.49 mi) | 7 November 2018 | Segment North, built between 2017 – 2018. |
Route description
editThis article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(November 2021) |
County | km | Type | Destination | Notes | |
---|---|---|---|---|---|
Heves |
0 | M3 / E71 – Budapest, Gyöngyös
|
The southern terminus of the expressway.
Kilometrage starting point | ||
6 | Laskó híd | híd means Bridge | |||
7 | Main road 3 – Kerecsend / Main road 33 – Füzesabony | ||||
10 | Main road 251 – Maklár, Bosch factory | ||||
15 | Main road 253 – Mezőkövesd, Andornaktálya | ||||
19 | Main road 252 – Eger Centrum, towards to Main road 25 → Ózd | The northern terminus of the expressway. | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Maintenance
editThe operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc. This activity is provided by this highway engineer.
Payment
editHungarian system has 2 main type in terms of salary:
1, time-based fee vignettes (E-matrica);
- Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024.[1]
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:
Type of county vignette Available section Heves full length (0 km – 19 km)
See also
editReferences
editExternal links
edit- National Toll Payment Services Plc. (in Hungarian, some information also in English)
- National Infrastructure Developer Ltd.