Line 1 (Nanhai Tram)

(Redirected from Nanhai Tram Line 1)

Nanhai Tram Line 1 (Chinese: 南海有轨电车1号线) or Nanhai New Transit (Chinese: 南海新交通) is a light metro line in Nanhai District, Foshan. The line uses light rail vehicles but it's infrastructure is constructed in a way that allow vehicles to operate completely conflict free from other traffic.[3] Construction started in January 2014.[4] The section from Leigang to Sanshan­xinchengbei opened on August 18, 2021,[5] and the section from Sanshan­xinchengbei to Linyuedong opened on November 29, 2022.[6]

Nanhai Tram Line 1
A tram at Kangyi Park station
Overview
Other name(s)Nanhai New Transit
StatusOperational
LocaleNanhai District, Foshan
Termini
Stations15
Service
TypeLight Metro
History
Opened18 August 2021; 3 years ago (2021-08-18)[1]
Technical
Line length14.345 km (8.9 mi)[2]
Track gauge1,435 mm (4 ft 8+12 in)

Opening timeline

edit
Segment Commencement Length Station(s) Name
Leigang — Sanshanxinchengbei 18 August 2021 9.5 km (5.90 mi) 10 Initial section
Sanshanxinchengbei — Linyuedong 29 November 2022 4.845 km (3.01 mi) 5 Remaining section

Stations

edit
 
Map of Nanhai Tram Line 1
Station
Station name Connections Location
English Chinese
TNH101 Leigang 𧒽岗  Guangfo  GF13 (OSI) Nanhai
TNH102 Huacuilu 华翠路
TNH103 Xiaxi 夏西
TNH104 Xiadong 夏东
TNH105 Kangyi Park 康怡公园
TNH106 Pingxi 平西
TNH107 Pingnan 平南
TNH108 Yuqijie 玉器街
TNH109 Zhongqu 中区
TNH110 Sanshanxinchengbei 三山新城北
TNH111 Wenhanhu Park (Ji Hua Laboratory) 文翰湖公园(季华实验室)
TNH112 Sanshanxinchengnan 三山新城南  4 
TNH113 Linyuebei 林岳北
TNH114 Linyue Xi 林岳西  2  F225
TNH115 Linyuedong 林岳东  2  F226[a] (OSI)
 11 

Notes

edit
  1. ^ According to the official map, the station is currently regarded as a non-interchange station.

References

edit
  1. ^ "明日开通运营的南海有轨电车一号线,到底"新"在哪?". 2021-08-17.
  2. ^ "南海新交通将开票价听证会,首通段将开通这10个站". 2021-04-20.
  3. ^ "佛山南海新交通有轨电车预计明年底开通试运营". gd.sina.com.cn (in Chinese). Retrieved 23 July 2024.
  4. ^ "南海新交通力争明年年中试运营". 2020-12-21.
  5. ^ "明天中午12点,南海有轨电车一号线首通段初期运营,未来可在这个点换乘地铁". 2021-08-17.
  6. ^ 李传智 (2022-11-28). "11月29日中午12时!南海有轨电车1号线后通段开通" [At 12:00 noon on November 29, the rear section of Nanhai Tram Line 1 opened]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-11-28. Retrieved 2024-07-31.
  NODES
Note 3