Stevenage railway station

Stevenage railway station serves the town of Stevenage in Hertfordshire, England. The station is around 44.4 kilometres (27.6 miles) north of London King's Cross on the East Coast Main Line.[1] Stevenage is served and managed by Great Northern, who operate Thameslink stopping services southbound to King’s Cross via stations such as Welwyn Garden City and Potters Bar, to Brighton and Horsham via central London and Gatwick Airport and to Moorgate via Watton-at-Stone, Hertford North and Enfield Chase and services northbound to Cambridge and Peterborough. It is also frequently served by London North Eastern Railway, who operate fast non-stopping services southbound towards London and northbound towards cities including York, Leeds and Edinburgh. Hull Trains and Lumo operate very limited services from the station.

Stevenage
National Rail
The station in November 2021 looking north, with the new platform 5 on the far left
General information
LocationStevenage, Borough of Stevenage
England
Grid referenceTL234241
Owned byNetwork Rail
Managed byGreat Northern
Platforms5
ConnectionsLocal Buses Regional Buses Local Taxis
Other information
Station codeSVG
ClassificationDfT category C1
History
Opened23 July 1973
Key dates
8 August 1850Original station opened by GNR
22 July 1973Station closed
23 July 1973Relocated 73 chains(1.5km) south to present location and opened by BR
29 September 1973Officially opened by Shirley Williams MP
Passengers
2019/20Decrease 4.634 million
 Interchange Decrease 1.654 million
2020/21Decrease 1.228 million
 Interchange Decrease 0.238 million
2021/22Increase 3.385 million
 Interchange Increase 0.833 million
2022/23Increase 4.050 million
 Interchange Increase 1.957 million
2023/24Increase 4.272 million
 Interchange Decrease 0.983 million
Notes
Passenger statistics from the Office of Rail and Road
Remains of old station

The present station was opened for trains on 23 July 1973.[2] It was officially opened on 26 September 1973 by Shirley Williams,[3] then MP for Stevenage, replacing the previous station, which was 73 chains (1,500 m) to the north,[1] and further away from the centre of the new town. The station was built by British Rail.

History

edit

The original Stevenage railway station was built in 1850 by the Great Northern Railway, despite the apparent hostility towards the railway being built there at that time due to the inevitable decline it would cause to local coach businesses,[4] which all ended shortly after the station was opened.

In 1946, Stevenage became one of the first New Towns, which resulted in a new town centre. In 1973, the railway station was relocated 73 chains (1.47 km) south, within walking distance (220 yd, 200 m) of the new town centre.[5]

In 2021, a tactile map was installed, in collaboration with the Royal National Institute of Blind People, to help blind and partially sighted passengers navigate the station.[6]

Facilities

edit

The station has two separate ticket offices (Great Northern and London North Eastern Railway), but in practice, each also sells the other's tickets. There are also seven ticket machines. There are toilets at street level (but not on the platforms) and lifts from the station building to both platforms.

 
Southbound view of the station from Platform 2 in January 2015, before the construction of platform 5

The station also has automatic ticket barriers, which were installed by First Capital Connect (the previous train operator) shortly after it took over the route, as a revenue protection exercise, and to improve security at the station. There is a snack bar, at street level, and two coffee bars at platform level, with one per platform. The newsagent previously at street level closed in March 2014, pending the redevelopment of the station which has since been completed. Since December 2013, the previous train operator, First Capital Connect started refurbishing the station completely, introducing passenger lifts between platform and street level, and refurbishing the concourse area plus retail units. The works were due to be completed by April 2014, but were delayed. Since Great Northern took over the franchise in September 2014, these works have been completed.

Both island platforms have indoor waiting rooms that were refurbished in May 2012 as part of a wider scheme to refurbish and add waiting rooms across the Great Northern Route, and there is also outdoor seating along the length of the platforms.

The station is a short walk on a walkway from Stevenage Bus Interchange and is opposite a leisure complex that includes the Gordon Craig Theatre.

Services

edit
Preceding station   National Rail Following station
London King's Cross   London North Eastern Railway
  Peterborough
or
Grantham
  Hull Trains
East Coast Main Line
Limited Service
  Grantham
  Lumo
  Newcastle
Great Northern
Peak Hours Only
Great NorthernTerminus
Great Northern
Thameslink

Great Northern

edit

Great Northern serve Stevenage with a half-hourly service to Moorgate which calls at all stations via the Hertford Loop Line. These services start and finish at Stevenage using Platform 5 at the station, which opened in 2020.[7] These services are operated using Class 717 EMUs.

Great Northern also operate an hourly fast service during the weekday peak hours between London King's Cross and Peterborough. Southbound, this service runs non-stop to London King's Cross and northbound, calls only at Biggleswade, St Neots and Huntingdon.[8] These services are operated using Class 387 EMUs.

London North Eastern Railway

edit
London North Eastern Railway
 
Inverness
 
Carrbridge
 
Aviemore
 
Kingussie
 
Newtonmore
 
Blair Atholl
 
Pitlochry
 
Dunkeld & Birnam
 
Perth
 
Gleneagles
 
Dunblane
 
Stirling
 
Falkirk Grahamston
 
 
Aberdeen
 
 
Stonehaven
 
 
Montrose
 
 
Arbroath
 
 
Dundee
 
 
Leuchars
 
 
Kirkcaldy
 
 
Inverkeithing
 
 
 
Glasgow Central  
 
 
 
Motherwell
 
 
 
 
Haymarket  
 
Edinburgh Waverley  
 
Dunbar
 
Reston
 
Berwick-upon-Tweed
 
Alnmouth
 
Morpeth
 
 
Sunderland  
 
 
 
Newcastle  
 
Durham
 
Darlington
 
 
Middlesbrough
 
 
Thornaby
 
 
 
Northallerton
 
 
Skipton
 
 
Keighley
 
 
 
Bradford Forster Square
 
 
 
York
 
 
Shipley
 
 
 
Harrogate
 
 
 
Horsforth
 
 
 
 
Hull Paragon
 
 
 
 
Brough
 
 
 
 
Selby
 
 
 
Leeds
 
 
 
Wakefield Westgate
 
 
 
 
Doncaster
 
Retford
 
 
Lincoln
 
 
 
Newark Northgate
 
Grantham
 
Peterborough
 
Stevenage
 
London King's Cross  

London North Eastern Railway generally serve Stevenage with two trains per hour in each direction during the day. The station is served by an hourly service between London King's Cross and Leeds, with a train every two hours continuing to Harrogate. The station is also served by an hourly service from London King's Cross, alternating northbound between terminating at Lincoln or York via Retford.[9]

During the peak hours, a small number of the services to Leeds are extended to and from Bradford Forster Square.

The station is also served by a small number of early morning and late evening services to and from Newcastle and Edinburgh Waverley.

Services are operated using Class 800 bi-mode trains, Class 801 EMUs and Intercity 225 loco-hauled sets.

Hull Trains

edit

Hull Trains operate a limited service at Stevenage on Sunday afternoons only. The station is served by one northbound service to Hull and two southbound services to London King's Cross.[10] Services are operated using Class 802 bi-mode trains.

edit

As of May 2023, most services at Stevenage are operated by Thameslink using Class 700 EMUs.

The typical off-peak service in trains per hour is:[11][8]

On Sundays, the services between Brighton and Cambridge are reduced to hourly, with the service to Horsham not operating.

Lumo

edit

As of October 2021, Lumo operates a number of services at Stevenage. The station is served by two northbound services to Edinburgh Waverley and three southbound services to London King's Cross.[12][13][14] Services are operated using Class 803 EMUs.

Additional platform

edit

Until May 2018 most weekday trains on the Hertford Loop Line were extended to Letchworth,[15] as there was insufficient capacity to accommodate terminating trains at Stevenage. However, in 2018, Govia Thameslink Railway cut back all services to start/terminate at Stevenage. To help alleviate the capacity problem, an additional south-facing bay platform was built at Stevenage, similar to the arrangement at Welwyn Garden City, which allows Hertford loop line services to start and terminate here. It was officially opened on 3 August 2020.[16]

See also

edit
  • Nala, a cat who is popular with commuters and known to sit on the ticket barriers at the station.

References

edit
  1. ^ a b Yonge, John (September 2006) [1994]. Jacobs, Gerald (ed.). Railway Track Diagrams 2: Eastern (3rd ed.). Bradford on Avon: Trackmaps. map 15B. ISBN 0-9549866-2-8.
  2. ^ Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 219. ISBN 1-85260-508-1. R508.
  3. ^ A brass plaque in the upstairs walkway/bridge commemorates this.
  4. ^ http://www.wordoxers.com/hos/main7.htm[permanent dead link]
  5. ^ "A History of Stevenage". www.localhistories.org. 14 March 2021.
  6. ^ Holden, Alan (19 May 2021). "Railway stations in Hertfordshire and Sussex mapped for blind and partially sighted passengers". Rail Advent. Retrieved 19 May 2021.
  7. ^ "Timetable B: Stevenage, Hertford North and Welwyn Garden City to London". Govia Thameslink Railway. Retrieved 17 August 2022.
  8. ^ a b "Timetable A: King's Lynn, Ely, Cambridge and Peterborough to London". Govia Thameslink Railway. Retrieved 17 August 2022.
  9. ^ "Full Train Timetable: May 2022" (PDF). London North Eastern Railway. Retrieved 17 August 2022.
  10. ^ "Full Timetable: May 2022" (PDF). Hull Trains. Retrieved 17 August 2022.
  11. ^ Table 25, 52 National Rail timetable, May 2022
  12. ^ Applications for the East Coast Main Line Office of Rail & Road 12 May 2016
  13. ^ First Group to run Edinburgh to London budget rail service BBC News 12 May 2016
  14. ^ VTEC and FirstGroup granted East Coast Main Line paths Railway Gazette International 12 May 2016
  15. ^ Timetables : Thameslink and Great Northern (A1)
  16. ^ New bay platform opened
edit

51°54′07″N 0°12′25″W / 51.902°N 0.207°W / 51.902; -0.207

  NODES
eth 1
News 2
see 2
Story 4