The Taketoyo Line (武豊線, Taketoyo-sen) is a Japanese railway line which connects Ōbu Station in Ōbu with Taketoyo Station in Taketoyo, both located in Aichi Prefecture. It is owned and run by the Central Japan Railway Company (JR Central). Opened in 1886, it was the first railway constructed in the prefecture.

Taketoyo Line
An image of a 313-1300 series electric multiple unit on the Taketoyo Line.
A 315 series EMU on the Taketoyo Line in March 2024
Overview
Native name武豊線
StatusIn operation
OwnerJR Central
LocaleAichi Prefecture
Termini
Stations10
Websitewebsite
Service
TypeRegional rail
Rolling stock315 series/313 series EMUs
History
OpenedMarch 1, 1886 (1886-03-01)
Technical
Line length19.3 km (12.0 mi)
Number of tracksEntire line single tracked
CharacterUrban
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC, overhead catenary
Operating speed85 km/h (53 mph)
Route Map (Numbers are distance from Ōbu in kilometers)

0.0
Ōbu (大府)
Prefectural Route 57 (Ōbu overpass)
Prefectural Route 50
River Ishigase
Prefectural Route 246
1.7
Owari-Morioka (尾張森岡)
River Okada
3.1
Ogawa (緒川)
River Myotokuji
4.6
Ishihama (石浜)
6.0
Owari-Ikuji (尾張生路) ~1944
6.8
Higashiura (東浦)
7.2
Fujie (藤江) ~1944
Prefectural Route 46
River Hieda
10.2
Kamezaki (亀崎)
12.8
Okkawa (乙川)
River Juga
National Route 247
14.6
Handa (半田)
River Kobe
16.3
Higashi-Narawa (東成岩)
National Route 247
19.3
Taketoyo (武豊)
River Hori
20.3
Taketoyo-Minato (武豊港) ~1965
An image of a geographically accurate Taketoyo Line route map, annotated in Japanese.
Geographically accurate route map of the line, with nearby railway lines included.

Trains run on the line for approximately 18 hours a day (from roughly 5:30 a.m. to 11:30 p.m.) and operate with a two-car formation every 30 minutes on average. four-car formation through services to Nagoya Station via the Tōkaidō Main Line are operated every 15 minutes during peak hours.

The line initially opened as the Handa Line for the transportation of building materials for the Tokyo–Osaka railway route via Central Japan. The line was later renamed to Taketoyo Line on May 1, 1886 and began carrying passengers. Due to demands from passing municipalities and local residents, the line has gone through upgrades, including electrification in 2015.

The line features the oldest actively used station building in Japan, located at Kamezaki Station. It also had the oldest overpass bridge in the country near Handa Station before it was demolished and relocated in 2021.

History

edit

The entire line from Atsuta to Taketoyo station opened on March 1, 1886 as the Handa line (later renamed to Taketoyo Line on May 1st)[1] after a 7-month-long construction,[2] to bring construction materials for the Osaka-Tokyo railway line that crosses through Central Japan,[3] and was planned to be deconstructed when the line was complete.[4][5] It was the first railway in the prefecture.[5] However, the proposed route was later changed due to the difficulty of the construction on July 19th,[2] and the line became a branch line when the Obu to Nagahama section of the Tokaido Main Line opened a year later, annexing the 19.5km section between Obu and Atsuta Station.[2][1][6] Before the opening of the line, one of the local workers proposed that the line also carry passengers, as the train was empty, when heading back to Taketoyo. This proposal was quickly accepted, with trains running 2 times a day.[4] The first train to run on the line was the Locomotive No. 1 in 1885 when it was used for the construction of the Taketoyo Line.[7] In 1892, Taketoyo station was relocated 950 meters closer to Ōbu, and the former station and section reopened as the freight-only Taketoyo Minato station.[8]

All locomotives in the line were replaced by gasoline cars in 1933.[2] Upon the opening of Meitetsu Kōwa Line in 1932, the ridership on the line decreased as the trains on Kōwa line ran more frequently and were quicker to reach Nagoya.[6] Platforms of Okkawa and Higashi-Narawa stations were extended in 1941. In 1944, all services using DMUs were replaced again by locomotives due to lack of resources from World War II, and stations Fujie and Owari-Ikuji merged into Higashiura station, which was located in between the two stations, replacing both of them. Owari-Morioka station was suspended from 1944 until 1957, after being deemed unnecessary.[2] On September 25, 1953, a typhoon hit the line and washed out the section between Taketoyo station and Higashi-Narawa station, killing a JNR worker.[6][9] Locomotive services were abolished again in 1970; one-manned operated services in the line started in 1992. The sections around Ogawa station was elevated in 1995.[2]

Modernization and electrification

edit

Due to the line being entirely single-tracked and unelectrified before the electrification, despite the line being the closest JR-owned line to the Chubu Centrair International Airport, local residents and municipalities requested the modernization of Taketoyo line.[10][11] In response to this, JR Central began work in March 2010 to electrify the line.[12] On 1 March 2015, the line was fully electrified, and through services to and from Nagoya commenced.[13]

Additionally, automatic ticket gates, ticket vending machines, and a centralized station management system [ja] were installed in all stations except Owari-Morioka and Ishihama beginning in October 2013. Following this installment, JR ticket kiosks in Ogawa, Higashiura, Kamezaki, and Taketoyo Stations were closed, and the stations became unstaffed.[14] The line introduced station numbering and line coloring in March 2018; the line was assigned the color brown and line code CE.[15] Construction to elevate the line around Handa Station began in 2020 and is expected to finish in 2026.[16]

Before the construction of Chubu Centrair International Airport, the Taketoyo Line was one of the three lines proposed to be connected with the airport. The proposed route would branch off from Okkawa Station and head west, connecting to the airport. This route was estimated to take around 53 minutes if a rapid service were created between Nagoya Station and the airport, far slower than the opposing Meitetsu Tokoname Line extension proposal which was both cheaper and faster.[17] No other development to the plan has since been reported.

Network and operations

edit

Services

edit

All train services on Taketoyo Line stop at every station, with trains running every 15–30 minutes on weekdays and 30–40 minutes on weekends, stopping at all stations in the line. Through services by semi-rapid trains to Nagoya via Tōkaidō Main Line, stopping only at two of the seven additional stations, are available during rush hours, and local services to Gifu are available in the first and last trains.[18] Most services are one-person operated.[19]

Although no stations in the line handle freight operations,[2] five freight trains operated by Kinuura Rinkai Railway pass through the line to connect to the Hekinan Line and Handa Line. Two high-speed freight trains run from Ōbu to Higashi-Narawa to Handafutō Station, and two freight trains head to Ōbu from Hekinanshi Station, with a freight train traveling from Ōbu to Hekinanshi.[19]

Legend — Station Status

  • ◼ Staffed stations
  • ◻ Unstaffed stations

Legend — Stopping Patterns

  • ● – All trains stop
  • | – Trains pass and do not stop
Station Local Semi-rapid Local (to Gifu)
CA74Gifu
CA73Kisogawa
CA72Owari-Ichinomiya
CA71Inazawa
CA70Kiyosu
CA69Biwajima
CA68Nagoya
CA67Otōbashi |
CA66Kanayama
CA65Atsuta |
CA64Kasadera |
CA63Ōdaka |
CA62Minami-Ōdaka |
CA61Kyōwa
CE00CA60Ōbu
CE01Owari-Morioka
CE02Ogawa
CE03Ishihama
CE04Higashiura
CE05Kamezaki
CE06Okkawa
CE07Handa
CE08Higashi-Narawa
CE09Taketoyo

Operators

edit

The line was operated by the Ministry of Railways since its construction until 1949, when operations of government-owned lines were transferred to the Japanese National Railways. After the privatization of JNR, the line was transferred to Central Japan Railway Company.[2]

Route

edit

The Taketoyo line takes a route along National route 366 [ja] and National route 247 [ja] in the suburbs and bedtowns of northeast Chita Peninsula to its terminus in Taketoyo. For the section between Handa and Taketoyo, Meitetsu Kowa Line runs west of the line. A freight-only branch used to continue ahead to Taketoyo-Minato, although the section was closed in 1965.[20] The entire line is single-tracked.[10]

Stations

edit

The line serves 10 stations (nine excluding the terminus Ōbu) across the length of the line. Most of the stations are built at grade, except for Ogawa Station, which is elevated. Works to elevate Handa Station and its surroundings to remove nine level crossings are currently ongoing, with work expected to be completed in 2026.[16][5]

No. Name Distance
(km)
Connections Location
CE00
CA60
Ōbu 大府 0.0   Tōkaidō Main Line (through service) Ōbu Aichi
CE01 Owari-Morioka 尾張森岡 1.7   Higashiura,
Chita District
CE02 Ogawa 緒川 3.1  
CE03 Ishihama 石浜 4.6  
CE04 Higashiura 東浦 6.8 Kinuura Rinkai Railway Hekinan Line
CE05 Kamezaki 亀崎 10.2   Handa
CE06 Okkawa 乙川 12.8  
CE07 Handa 半田 14.6  
CE08 Higashi-Narawa 東成岩 16.3 Kinuura Rinkai Railway Handa Line
CE09 Taketoyo 武豊 19.3   Taketoyo,
Chita District

Infrastructure

edit

Rolling stock

edit

Currently, the line uses two types of electric multiple unit (EMU) trains manufactured by Nippon Sharyo after the electrification works. 313 series trains are used on the line in two-car formations operated by a single crew.[21] 315 series trains were introduced on the line on 15 March 2024,[22] replacing 211 series trains that were in use since the electrification. 315 series trains are usually operated during rush hours in four-car formations on through services to Nagoya.[23]

Accessibility

edit

Several stations on the line have been upgraded to feature ramps, lifts, and elevators. The cost for these upgrades are funded by charging extra fares from riders. However, smaller stations, such as Owari-Morioka, Ishihama, Okkawa, and Higashi-Narawa has not been upgraded yet.[24]

Others

edit

A centralized traffic control system was installed in 2001.[25] An automatic train stopping system was installed in the line in 2011.[26] The line had the oldest overpass bridge in Japan near Handa Station before it was demolished and relocated in 2021, to make way for the elevation works. The line also features the oldest actively used station building in Japan, located at Kamezaki Station.[27][28]

References

edit
  1. ^ a b "武豊線の歴史" [History of Taketoyo Line] (PDF). Aichi Now. Archived (PDF) from the original on 23 September 2024. Retrieved 16 May 2024.
  2. ^ a b c d e f g h Takeuchi 2003, pp. 181–183.
  3. ^ Kokoris, James A (1948). Early History and Development of the Railways of Japan. University of Michigan Center for Japanese Studies. p. 31.
  4. ^ a b "武豊線の歴史 開通までの道のり|武豊町公式ホームページ" [Road to Taketoyo Line's opening]. Taketoyo Town Official Website (in Japanese). Archived from the original on 14 March 2024. Retrieved 12 May 2024.
  5. ^ a b c "もうすぐ140歳の通勤路線!? どうなる「愛知県最初の鉄道」の歴史遺産 電化経てついに変化のとき" [A railway line that is almost 140 years old - the first railway in Aichi prefecture about to change with electrification]. Trafficnews (in Japanese). 12 December 2023. Archived from the original on 23 September 2024. Retrieved 14 September 2024.
  6. ^ a b c Takahashi, Masato. 図説知多半島の歴史 [History of Chita peninsula]. Kyodo Publishing.
  7. ^ Takeuchi 2003, p. 53.
  8. ^ Takeuchi 2003, pp. 2–3.
  9. ^ "武豊線の豆知識|武豊町公式ホームページ" [Facts about Taketoyo]. Taketoyo Town Official Website (in Japanese). Archived from the original on 3 February 2024. Retrieved 14 March 2024.
  10. ^ a b "武豊線の近代化促進に関する要望" [Request to modernize Taketoyo line] (PDF). Archived from the original (PDF) on 24 September 2015. Retrieved 12 May 2024.
  11. ^ "武豊線の電化|東浦町" [Electrification of Taketoyo line | Higashiura]. Town of Higashiura (in Japanese). Archived from the original on 23 September 2024. Retrieved 16 May 2024.
  12. ^ "電化で利便性アップ ── 今月電化開業したJR武豊線。CO2排気量削減効果も(THE PAGE)" [Increased convenience with electrification - the JR Taketoyo line that opened this month.]. Yahoo! (in Japanese). Retrieved 20 October 2024.
  13. ^ JR東海、ダイヤ改正で国鉄時代の気動車など置換え - 武豊線電化で列車増発 [JR Central to replace JNR-era diesel trains and increase services on Taketoyo Line following electrification]. Mynavi News (in Japanese). Japan: Mynavi Corporation. 21 December 2014. Archived from the original on 11 February 2015. Retrieved 12 February 2015.
  14. ^ "JR東海、武豊線6駅に遠隔案内システムを導入…10月1日から使用開始" [JR Central to install centralized station management systems to 6 stations in Taketoyo line from October]. レスポンス(Response.jp) (in Japanese). 23 August 2013. Archived from the original on 15 July 2015. Retrieved 12 May 2024.
  15. ^ "JR東海,在来線に駅ナンバリングを導入|鉄道ニュース|2017年12月14日掲載|鉄道ファン・railf.jp" [JR Central to introduce station numbering on conventional lines]. 鉄道ファン・railf.jp (in Japanese). Archived from the original on 1 November 2020. Retrieved 14 March 2024.
  16. ^ a b "半田市/JR武豊線半田駅付近連続立体交差事業の工事に着手します" [Handa City/Works to remove ground crossings in Taketoyo line near Handa station will start]. Handa City. Archived from the original on 11 April 2023. Retrieved 14 March 2024.
  17. ^ "JR線でセントレアに行けるのか?" [Is it possible for the JR line to extend into Centrair?] (PDF). Chubu Economics Inter-Seminar. Archived (PDF) from the original on 23 September 2024. Retrieved 12 May 2024.
  18. ^ "JR武豊線(大府〜武豊)の時刻表 - 駅探" [Timetable for JR Taketoyo line] (in Japanese). Ekitan. Archived from the original on 23 September 2024. Retrieved 12 May 2024.
  19. ^ a b "知多半島を走る愛知最古の路線「武豊線」で10の謎を解く" [Solving 10 mysteries in the oldest railway line in Aichi Prefecture ruining through Chita peninsula, Taketoyo line.]. GetNavi web ゲットナビ (in Japanese). Archived from the original on 23 September 2024. Retrieved 29 June 2024.
  20. ^ "武豊港(衣浦港)の歴史 武豊港駅の開業、時代の変遷|武豊町公式ホームページ" [History of Taketoyo port]. Taketoyo Town Official Website (in Japanese). Archived from the original on 3 February 2024. Retrieved 14 March 2024.
  21. ^ "JR東海の車両・列車(9) 313系、電化開業直後の武豊線を走る4両編成" [313 series, a four-car train running on the Taketoyo Line shortly after the electrification]. マイナビニュース (in Japanese). MyNavi News. 2 March 2015. Archived from the original on 23 September 2024. Retrieved 12 May 2024.
  22. ^ "315系が東海道本線・武豊線で営業運転を開始" [315 series begins commercial operation on the Tōkaidō Main Line and Taketoyo Line]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 16 March 2024. Archived from the original on 29 March 2024. Retrieved 15 May 2024.,
  23. ^ "JR東海、315系4両編成が武豊線の区間快速に - 東海道本線にも315系" [JR Central, 4-car 315 series formations to be used for semi-rapid services in Taketoyo line - 315 series in the Tokaido Main Line]. MyNavi News (in Japanese). 23 March 2024. Archived from the original on 23 September 2024. Retrieved 14 July 2024.
  24. ^ "主な駅のバリアフリー情報(一覧)|JR東海" [Barrier-free information for major stations (list)]. JR Central. Archived from the original on 15 September 2024. Retrieved 15 September 2024.
  25. ^ "『鉄道ジャーナル』第35巻第5号" [Railway Journal Vol. 35, No. 5]. Railway Journal.
  26. ^ "自動列車停止装置(ATSーPT型)導入の進捗について" [Progress of the introduction of Automatic Train Stop Devices (ATS-PT type)] (PDF). JR Central. Archived (PDF) from the original on 23 September 2024. Retrieved 12 September 2024.
  27. ^ "Going retro: Tokyo Station, and 17 historical train stations in Japan!". JR Times (in Japanese). Archived from the original on 23 September 2024. Retrieved 14 September 2024.
  28. ^ "End of the line for Japan's oldest railway station overpass with over 110-year history". Mainichi Daily News. 4 June 2021. Retrieved 15 October 2024.

Bibliography

edit

Takeuchi, Hiroshi (25 March 2003). 武豊線物語 [Taketoyo Line stories] (in Japanese). Handa City.

  NODES
INTERN 2
Note 1