Uttara Center metro station

Uttara Center (Bengali: উত্তরা সেন্টার romanised: Uttora sentar) is an elevated metro station of the Dhaka Metro's MRT Line 6, located in Uttara, neighbourhood of Dhaka. The station commenced operation from 18 February 2023.[2][3][4]

Uttara Center

উত্তরা সেন্টার
Dhaka Metro Rail station
Interior of the station
General information
Other namesStation 2
LocationArtist Quamrul Hassan Road, Sector 17, Uttara, Dhaka
Bangladesh
Coordinates23°51′35″N 90°21′54″E / 23.8598°N 90.3651°E / 23.8598; 90.3651
Owned byDhaka Mass Transit Company Limited
Line(s) MRT Line 6 
PlatformsSide platform
Tracks2
Construction
Structure typeElevated
Platform levels3
ParkingNo
Bicycle facilitiesNo
AccessibleYes Disabled access
History
Opened18 February 2023 (2023-02-18)
Electrified1,500 V DC overhead catenary
Services
Preceding station Dhaka Metro Following station
Uttara North
Terminus
MRT Line 6 Uttara South
towards Kamalapur
Location
Map

History

edit

The Uttara Centre metro station was constructed under "Package CP-03". The notification of application for construction of raised bridges for stations and railways was published on 30 June 2015 and the last date for submission of applications was 9 September 2015. Italian-Thai Development Public Company Limited gets work contract for "Package CP-03". The agreement document was sent to the ministry on 29 March 2016 for NBR investigation and law and parliamentary investigation. The signing ceremony for the agreement package was held on 3 May 2017 at the Pan Pacific Sonargaon Hotel in Dhaka. Construction work started on 2 August 2017.[5][6]

Transit Oriented Development Hub

edit

There will be a TOD hub in all stations of Metro Rail Line-6. This TOD (Transit Oriented Development) hub houses shops, commercial office etc. According to authority the first TOD hub will be constructed in this station.[7]

Station

edit

Station layout

edit
G Path level Exit / Entry
L1 Between Rent control, station agent, metro card vending machine, crossover
L2 Side platform | Doors will open on the left  
Platform 1
Southbound
Towards → Agargaon next station is Uttara South
Platform 2
Northbound
Towards ← Uttara North
Side platform | Doors will open on the left  
L2


References

edit
  1. ^ "Line 6 route map" (PDF). Dhaka Mass Transit Company Limited. Retrieved 23 December 2022.
  2. ^ "প্রধানমন্ত্রীকে নিয়ে মাত্র ১০ মিনিটে দিয়াবাড়ি থেকে আগারগাঁওয়ে মেট্রোরেল". Prothom Alo (in Bengali). 28 December 2022. Retrieved 28 December 2022.
  3. ^ Tuhin Shubhra Adhikary (6 June 2021). "Uttara-Agargaon Metro Rail: Launch now aimed at Dec 2022". The Daily Star.
  4. ^ "মেট্রোরেলের 'উত্তরা সেন্টার' স্টেশন খুললো". Bdnews24.com (in Bengali). 18 February 2023. Retrieved 18 February 2023.
  5. ^ "CP-03, CP-04 (Viaduct & Stations, Uttara-Agargaon)". 17 March 2020. Archived from the original on 15 January 2022. Retrieved 22 January 2022.
  6. ^ "Construction of Metro rail and station starts today". The Asian Age. 2 August 2017.
  7. ^ Hossain, Anwar (9 March 2021). "বাড়তি আয়ের জন্য খোলা হবে বিপণিবিতান". Prothom Alo (in Bengali).
edit
  NODES
HOME 1
languages 1
mac 1
Note 1
os 2