Baker Street tube station

Baker Street is a London Underground station at the junction of Baker Street and the Marylebone Road in the City of Westminster. It is one of the original stations of the Metropolitan Railway (MR), the UK's first underground railway, opened on 10 January 1863.[8]

Baker Street London Underground
Station entrance
Baker Street is located in Central London
Baker Street
Baker Street
Location of Baker Street in Central London
LocationMarylebone
Local authorityCity of Westminster
Managed byLondon Underground
Number of platforms10
Fare zone1
OSIMarylebone National Rail[1]
London Underground annual entry and exit
2019Increase 28.07 million[2]
2020Decrease 8.48 million[3]
2021Increase 11.15 million[4]
2022Increase 20.52 million[5]
2023Increase 21.21 million[6]
Key dates
10 January 1863 (10 January 1863)Opened (MR)
April 1868Opened (MR platforms to north)
10 March 1906Opened (BS&WR, as terminus)
27 March 1907Extended (BSWR – Marylebone)
20 November 1939Started (Bakerloo to Stanmore)
1961Ended (Met to Aylesbury)
1 May 1979Ended (Bakerloo to Stanmore)
1 May 1979Started (Jubilee line)
30 July 1990Ended (Met to H'smith/Barking)
30 July 1990Started (Hammersmith & City)
Listed status
Listing gradeII* (since 28 June 2010)
Entry number1239815[7]
Added to list26 March 1987; 37 years ago (1987-03-26)
Other information
External links
Coordinates51°31′19″N 0°09′25″W / 51.522°N 0.157°W / 51.522; -0.157
London transport portal

The station is in Travelcard Zone 1 and is served by five lines.[9] On the Circle and Hammersmith & City lines the station is between Edgware Road and Great Portland Street stations, and on the Metropolitan line it is between Finchley Road and Great Portland Street stations. On the Bakerloo line the station is between Marylebone and Regent's Park stations, and on the Jubilee line it is between St John's Wood and Bond Street stations.[9]

Location

edit
 
Location of Baker Street station
 
The original Baker Street station entrances on each side of Marylebone Road, 1862

The station has entrances on Baker Street, Chiltern Street (ticket holders only) and Marylebone Road. Nearby attractions include Regent's Park, Lord's Cricket Ground, the Sherlock Holmes Museum and Madame Tussauds.

History

edit

Metropolitan Railway – the UK's first underground railway

edit

In the first half of the 19th century, the population and physical extent of London grew greatly.[note 1] The congested streets and the distance to the city from the stations to the north and west prompted many attempts to get parliamentary approval to build new railway lines into the city.[note 2] In 1852, Charles Pearson planned a railway from Farringdon to King's Cross. Although the plan was supported by the city, the railway companies were not interested and the company struggled to proceed.[15] The Bayswater, Paddington, and Holborn Bridge Railway Company was established to connect the Great Western Railway's (GWR) Paddington station to Pearson's route at King's Cross.[15] A bill was published in November 1852[16] and in January 1853 the directors held their first meeting and appointed John Fowler as its engineer.[17] Several bills were submitted for a route between Paddington and Farringdon.[18] The company's name was also to be changed again, to Metropolitan Railway[15][19][note 3] and the route was approved on 7 August 1854.[18][20]

 
Sign on wall beside Marylebone Road beyond station entrance

Construction began in March 1860;[21] using the "cut-and-cover" method to dig the tunnel.[22][23] Despite several accidents during construction,[24] work was complete by the end of 1862 at a cost of £1.3 million.[25] Rail services through the station opened to the public on Saturday, 10 January 1863.[26][note 4]

In the next few years, extensions of the line were made at both ends with connections from Paddington to the GWR's Hammersmith and City Railway (H&CR) and at Gloucester Road to the District Railway (DR). From 1871, the MR and the DR operated a joint Inner Circle service between Mansion House and Moorgate Street.[8][note 5]

North-western "branch"

edit

In April 1868, the Metropolitan & St John's Wood Railway (M&SJWR) opened a single-track railway in tunnel to Swiss Cottage from new platforms at Baker Street East (which eventually become the present Metropolitan line platforms).[28][29] The line was worked by the MR with a train every 20 minutes. A junction was built with the original route at Baker Street, but there were no through trains after 1869.[30][note 6]

The M&SJWR branch was extended in 1879 to Willesden Green and, in 1880, to Neasden and Harrow-on-the-Hill.[33] Two years later, the single-track tunnel between Baker Street and Swiss Cottage was duplicated and the M&SJWR was absorbed by the MR.[34][note 7]

Bakerloo and Jubilee lines

edit
 
Route diagram which shows the original route between Baker Street and Waterloo.

In November 1891, a private bill was presented to Parliament for the construction of the Baker Street and Waterloo Railway (BS&WR).[35] The railway was planned to run entirely underground from Marylebone[36] to Elephant & Castle[37] via Baker Street and Waterloo[35] and was approved in 1900.[38][39] Construction commenced in August 1898[40] under the direction of Sir Benjamin Baker, W. R. Galbraith and R. F. Church[41] with building work by Perry & Company of Tredegar Works, Bow.[41][note 8] Test trains began running in 1905.[45] The official opening of the BS&WR by Sir Edwin Cornwall took place on 10 March 1906.[46] The first section of the BS&WR was between Baker Street and Lambeth North.[47] Baker Street was the temporary northern terminus of the line until it was extended to Marylebone on 27 March 1907, a year after the rest of the line.[8][47] The BS&WR's station building designed by Leslie Green stood on Baker Street and served the tube platforms with lifts, but these were supplemented with escalators in 1914, linking the Metropolitan line and the Bakerloo line platforms by a new concourse excavated under the Metropolitan line.[48] An elaborately decorated restaurant and tea-room was added above Green's terminal building, the Chiltern Court Restaurant, which was opened in 1913.[49]

On 1 July 1933, the MR and BS&WR amalgamated with other Underground railways, tramway companies and bus operators to form the London Passenger Transport Board (LPTB), and the MR became the Metropolitan line, while the BS&WR became the Bakerloo line of London Transport.[50] However, there was a bottleneck on the Metropolitan line at Finchley Road where four tracks merge into two to Baker Street. LPTB decided to extend the Bakerloo line from Baker Street as a branch line, taking over the existing section between Finchley Road and Stanmore.[note 9] Construction began in April 1936. On 20 November 1939, following the construction of an additional southbound platform and connecting tube tunnels between Baker Street and Finchley Road stations, the Bakerloo line took over the Metropolitan line's stopping services between Finchley Road and Wembley Park and its Stanmore branch.[52] [53] The current Bakerloo ticket hall and escalators to the lower concourse were provided in conjunction with the new service.[54]

After the Victoria line had been completed in the 1960s, the new Jubilee line was proposed which would take a route via Baker Street, Bond Street, Trafalgar Square, Strand, Fleet Street, Ludgate Circus and Cannon Street, then proceeding into southeast London.[55] This new line was to have been called the Fleet line.[56] The Jubilee line added an extra northbound platform and replaced the Bakerloo line service to Stanmore from the station, opening on 1 May 1979.[8][57]

Circle and Hammersmith & City lines

edit

The initial route on the Hammersmith & City line was formed by the H&CR, running between Hammersmith and Moorgate. Services were eventually extended to Barking via the DR and shared with the existing MR tracks between Baker Street and Liverpool Street.[8] The route between Hammersmith and Barking was shown on the tube map as part of the Metropolitan line, but since 1990 has been shown separately, the Metropolitan line becoming the route from Aldgate to Baker Street and northwards through "Metro-Land" to Uxbridge, Watford and Amersham.[8][58]

The circle line was initially formed by the combination of the MR and DR routes, which were between Edgware Road and South Kensington, Edgware Road and Aldgate via King's Cross St Pancras, South Kensington and Mansion House,[59][60] and a joint railway between Mansion House and Aldgate.[61][8][62][63] Since 1949, the Circle line is shown separately on the map.[64]

Incidents

edit

On 18 June 1925, electric locomotive No.4 collided with a passenger train when a signal was changed from green to red just as the locomotive was passing it. Six people were injured.[65]

On 23 August 1973, a bomb was found in a carrier bag in the ticket hall.[66] The bomb was defused by the bomb squad. A week later, on 30 August, a member of staff found another bomb left on the overbridge. Again, it was defused without any injury.[67]

The station today

edit
 
Station entrance for Bakerloo and Jubilee lines on Marleybone Road

Baker Street station is the combination of three separate stations, with several booking offices throughout its operational years. Major changes took place in 1891-93 and 1910–12. The first part is the Circle Line station, which has its two platforms now used by the Circle and Hammersmith & City lines. They are situated on a roughly east-to-west alignment beneath Marylebone Road, spanning approximately the stretch between Upper Baker Street and Allsop Place. This was part of the original Metropolitan Railway from Bishop's Road (now Paddington (Circle and Hammersmith & City lines) station to Farringdon Street (now Farringdon) which opened on 10 January 1863.[68]

The platforms serving the main branch of the Metropolitan line towards Harrow, Uxbridge and beyond are located within the triangle formed by Marylebone Road, Upper Baker Street and Allsop Place, following the alignment of Allsop place. This station is the second section which opened on 13 April 1868 by the Metropolitan & St. John's Wood Railway. This was later absorbed by the Metropolitan Railway, which is usually known to them as Baker Street East station.[68]

The final section is the deep-level tube station of the Baker Street & Waterloo Railway (now part of the Bakerloo line), situated at a lower level beneath the site of Baker Street East, opened on 10 March 1906.[68] This part of the station now contains four platforms which are used by both the Bakerloo and Jubilee lines.[69]

This station is a terminus for some Metropolitan line trains, but there is also a connecting curve that joins to the Circle line just beyond the platforms, allowing Metropolitan line through services to run to Aldgate. The deep-level Bakerloo and Jubilee lines platforms are arranged in a cross-platform interchange layout[70] and there are track connections between the two lines just to the north of the station.[69] Access to the Bakerloo and Jubilee lines is only via escalators.[71]

 
A Hammersmith and City Line train to Barking arrives at Baker Street's oldest platforms opened in 1863

With ten platforms overall, Baker Street has the most London Underground platforms of any station on the network.[72] Since Swiss Cottage and St John's Wood have replaced the former three stations between Finchley Road and Baker Street on the Metropolitan line, it takes an average of five and a half minutes to travel between them.[73] Essentially, the Metropolitan Line operates as a fast service while the Jubilee Line offers local service between the two stations.

As part of the Transported by Design programme of activities, on 15 October 2015, after two months of public voting, Baker Street underground station's platforms were elected by Londoners as one of the 10 favourite transport design icons.[74][75]

The former Chiltern Court Restaurant above the station is still in use today as the Metropolitan Bar, part of the Wetherspoons pub chain.[49] The rest of the block, known as Chiltern Court and completed by the Metropolitan Railway's in-house architect, Charles Walter Clark in 1929, houses residential apartments.[76]

Sub-surface platforms

edit
 
Unique tile-work in this station commemorates the fictional Sherlock Holmes's association with Baker Street

Of the MR's original stations, now the Circle and Hammersmith & City line platforms five and six are the best preserved dating from the station's opening in 1863. Plaques of the Metropolitan Railway's coat of arms along the platform and old plans and photographs depict the station which has changed remarkably little in over a hundred and fifty years.[77] Restoration work in the 1980s on the oldest portions of Baker Street station brought it back to something similar to its 1863 appearance.

The Metropolitan line's platforms one to four were largely the result of the station's rebuild in the 1920s to cater for the increase in traffic on its outer suburban routes. Today the basic layout remains the same with platforms two and three being through tracks for City services to Aldgate from Amersham, Chesham and Uxbridge flanked by terminal platforms one and four which are the domain of services to and from Watford. The northern end of the platforms is in a cutting being surrounded by Chiltern Court and Selbie House the latter of which houses Baker Street control centre responsible for signalling the Metropolitan line from Preston Road to Aldgate, as well as the Circle and Hammersmith & City lines between Baker Street and Aldgate. The southern end of the platforms are situated in a cut and cover tunnel which runs towards Great Portland Street. All Metropolitan line platforms can function as terminating tracks however under normal circumstance only dead ended platforms one and four are used as such.[78]

Deep-level tube platforms

edit

The Bakerloo line uses platforms 8 and 9,[citation needed] which date from 10 March 1906 when the Baker Street & Waterloo railway opened between here and Lambeth North (then called Kennington Road). The contraction of the name to "Bakerloo" rapidly caught on, and the official name was changed to match in July 1906.

By the mid-1930s, the Metropolitan line was suffering from congestion caused by the limited capacity of its tracks between Baker Street and Finchley Road stations. To relieve this pressure, the network-wide New Works Programme, 1935–1940 included the construction of new sections of tunnel between the Bakerloo line's platforms at Baker Street and Finchley Road and the replacement of three Metropolitan line stations (Lord's, Marlborough Road and Swiss Cottage) between those points with two new Bakerloo stations (St John's Wood and Swiss Cottage). The Bakerloo line also took over the Metropolitan line's service to Stanmore on 20 November 1939. The branch remained part of the Bakerloo line until 1 May 1979, when similar congestion problems for the Bakerloo line caused by the two branches converging at Baker Street led to the opening of the Jubilee line, initially created by connecting the Stanmore branch to new tunnels bored between Baker Street and Charing Cross. Following refurbishment in the 1980s the original tiling scheme was replaced with tiles depicting the silhouette of Sherlock Holmes, who lived at 221B Baker Street.

The Bakerloo still maintains its connection with the now Jubilee line tracks to Stanmore, with tunnels linking from Northbound Bakerloo line platform 9 to the Northbound Jubilee line toward St John's Wood and Southbound from Jubilee line platform seven to the Southbound Bakerloo line towards Regent's Park.[79] Although no passenger services operate over these sections they can be used for the transfer of engineering trains and were used to transfer Bakerloo line 1972 stock trains to and from Acton Works as part of a refurbishment programme.[80]

Jubilee line trains use platforms 7 and 10,[citation needed] which opened in 1979 when the newly built Jubilee line took over existing Bakerloo line services to Stanmore running through new tunnels from Baker Street to Charing Cross to serve as a relief line to the Bakerloo, which by then was suffering from capacity issues. In 1999 the Jubilee line was extended from Green Park to Stratford, making the Jubilee line platforms at Charing Cross redundant after twenty years. The design of the Jubilee line platforms at Baker Street has changed little since being opened, with illustrations depicting famous scenes from Sherlock Holmes cases.

Cross-platform interchange is provided between the Bakerloo and Jubilee lines in both directions.

Station improvements

edit

Step-free access project

edit

In 2008 TfL proposed a project to provide step-free access to the sub-surface platforms. The project was a TfL-funded Games-enabling project in its investment programme (and not a project specifically funded as a result of the success of the London 2012 Games bid).[81] The project was included in the strategy on accessible transport published by the London 2012 Olympic Delivery Authority and the London Organising Committee of the Olympic and Paralympic Games.[82]

Access to the Metropolitan line platforms 1–4 (serving trains to and from Finchley Road) would be provided by a bridge from the Bakerloo and Jubilee line ticket hall, with a lift from the bridge to each island platform. Through a passage from platforms 1–2, this would also give step-free access to platform 5 (Circle and Hammersmith & City line eastbound trains). Access to platform 6 (Circle and Hammersmith & City line westbound trains) would be provided by demolishing the triangular building outside the station, on the north side of Marylebone Road, and taking over the public pedestrian subway under Marylebone Road to provide a link between a lift up from platform 5 to the subway and a lift at the other end of the subway down to platform 6. The replacement for the triangular building would also act as an emergency exit for the station.[83]

TfL applied for planning permission and listed building consent for providing access to platforms 5 and 6 on 1 October 2008, but the application was subsequently withdrawn. (The part of the proposed scheme to provide step-free access to platforms 1–4 is within TfL's permitted development rights, and so does not require planning permission.)[84] TfL announced on 31 March 2009 that because of budgetary constraints the step-free scheme would be deferred.[85]

Platform lengthening

edit

In order to accommodate the new, longer S stock trains, which started operating Metropolitan line services in August 2010, platforms 1 and 4 have been extended.[86] However, the Circle and Hammersmith & City line platforms 5 and 6 have not been extended to accommodate their new S7 Stock trains, due to the enclosed nature of the platforms. Instead, selective door operation is employed.

Services

edit

Bakerloo line

edit
 
A Bakerloo line train arriving at southbound platform 8.

On the Bakerloo line, Baker Street station is between Regent's Park and Marylebone.[9] Trains can terminate at Queen's Park, Stonebridge Park, or Harrow and Wealdstone to the north, and Piccadilly Circus, Lambeth North or Elephant & Castle to the south.[87]

The typical service pattern in trains per hour (tph) operated during off-peak hours is:[88]

  • 6 tph to Harrow & Wealdstone via Queen's Park and Stonebridge Park (Northbound)
  • 3 tph to Stonebridge Park via Queen's Park (Northbound)
  • 11 tph to Queen's Park (Northbound)
  • 20 tph to Elephant & Castle (Southbound)

Weekday peak service operates with one or two additional Queen's Park-Elephant & Castle trains per hour, and Sunday service operates with two fewer Queen's Park-Elephant & Castle trains per hour during the core of the day.

Jubilee line

edit
 
A Jubilee line train standing at northbound platform 10.

On the Jubilee line, the station is situated between Bond Street to the south and St John's Wood to the north. Southbound trains usually terminate at Stratford and North Greenwich although additional turn back points are provided at Green Park, Waterloo, London Bridge, Canary Wharf and West Ham. Northbound trains usually terminate at Stanmore, Wembley Park and Willesden Green although additional turn back points are available at Finchley Road, West Hampstead and Neasden.[89]

As off the May 2022 timetable the typical off-peak service in trains per hour (tph) is:[90]

  • 24 tph Southbound to Stratford
  • 12 tph Northbound to Stanmore
  • 4 tph Northbound to West Hampstead
  • 4 tph Northbound to Wembley Park
  • 4 tph Northbound to Willesden Green

The Night tube service (Friday night to Saturday morning & Saturday night to Sunday morning) in trains per hour is:[90]

  • 6 tph Southbound to Stratford
  • 6 tph Northbound to Stanmore

Circle line

edit

The station is between Great Portland Street and Edgware Road on this line as well on the Hammersmith & City line.[9]

The typical service in trains per hour is:[91]

  • 6tph Clockwise to Edgware Road via King's Cross St Pancras, Liverpool Street, Tower Hill and Victoria
  • 6tph Anti-clockwise to Hammersmith via Paddington

Hammersmith & City line

edit

Between 1 October 1877 and 31 December 1906 some services on the H&CR were extended to Richmond over the London and South Western Railway (L&SWR) via its station at Hammersmith (Grove Road).[92][note 10]

The station is between Great Portland Street and Edgware Road on this line, as with the Circle line.[9]

The typical off-peak service in trains per hour (tph) is:[91]

  • 6 tph Eastbound to Barking or Plaistow
  • 6 tph Westbound to Hammersmith

Metropolitan line

edit
 
Old versus new: A60 stock on the left and S8 stock on the right.
 
The Metropolitan line platforms viewed from above, with a train at platform 1

The Metropolitan line is the only line to operate an express service although currently this is mostly southbound in the morning peaks and northbound in the evening peaks.[93] Southbound fast services run non-stop between Moor Park, Harrow-on-the-Hill and Finchley Road whilst semi-fast services run non stop between Harrow-on-the-Hill and Finchley Road. Northbound fast and semi-fast services call additionally at Wembley Park.[94]

The station is situated between Great Portland Street sharing tracks with the Circle and Hammersmith & City lines in the East and Finchley Road Station to the North. Southbound trains may terminate here and return north towards Uxbridge, Amersham, Chesham, or Watford, where platforms 1 and 4 are used.[69]

The off-peak service in trains per hour is:[94]

  • 12 tph Southbound to Aldgate
  • 4 tph Southbound services terminate here
  • 2 tph Northbound to Amersham (all stations)
  • 2 tph Northbound to Chesham (all stations)
  • 4 tph Northbound to Watford (all stations)
  • 8 tph Northbound to Uxbridge (all stations)
Preceding station   London Underground Following station
Marylebone Bakerloo line Regent's Park
Edgware Road
towards Hammersmith
Circle line
Great Portland Street
towards Edgware Road via Aldgate
Hammersmith & City line Great Portland Street
towards Barking
St John's Wood
towards Stanmore
Jubilee line Bond Street
towards Stratford
Finchley Road Metropolitan line Great Portland Street
towards Aldgate
Terminus
Former services
Preceding station   London Underground Following station
St John's Wood
towards Stanmore
Bakerloo line
Stanmore branch (1939–1979)
Regent's Park
Lord's Metropolitan line
(1868–1939)
Great Portland Street
towards Aldgate
Terminus
Edgware Road
towards Hammersmith
Metropolitan line
Hammersmith branch (1864–1990)
Great Portland Street
towards Barking

Connections

edit

The station is served by London Buses day and night routes.[95][96]

Points of interest

edit
edit
 
Baker Street platform sign

The Metropolitan Bar above Baker Street station is featured in Metro-Land, a 1973 documentary film by John Betjeman in which he reminiscences about its genteel origins as the Chiltern Court Restaurant, which formed part of the block, Chiltern Court, which Clark constructed above the station.[98][49]

See also

edit

Notes and references

edit

Notes

edit
  1. ^ In 1801, approximately one million people lived in the area that is now Greater London. By 1851 this had doubled.[10] The increasing resident population and the development of a commuting population arriving by train each day led to a high level of traffic congestion with huge numbers of carts, cabs, and omnibuses filling the roads and up to 200,000 people entering the City of London, the commercial heart, each day on foot.[11]
  2. ^ None were successful, and the 1846 Royal Commission on Metropolitan Railway Termini banned construction of new lines or stations in the built-up central area.[12][13] The concept of an underground railway linking the City with the mainline termini was first proposed in the 1830s.[14]
  3. ^ The original established name was the "North Metropolitan Railway".[18]
  4. ^ The railway included a ceremonial run from Paddington and a large banquet for 600 shareholders and guests at Farringdon a day earlier.[27] These platforms are now served by the Circle and Hammersmith & City lines.[8]
  5. ^ After further extensions by the Metropolitan Railway to Liverpool Street (1875), Aldgate (1876) and Tower of London (1882), the Inner Circle was completed in 1884.[8]
  6. ^ The original intention of the M&SJWR was to run underground north-east to Hampstead Village, and indeed this appeared on some maps.[31] This was not completed in full and the line was built in a north-western direction instead; a short heading of tunnel was built north of Swiss Cottage station in the direction of Hampstead.[32] This is still visible today when travelling on a southbound Metropolitan line service.
  7. ^ Further extensions took the Metropolitan Railway to Pinner (1885), Rickmansworth (1887), Chesham (1889), Aylesbury (1892), Uxbridge (1904) and Watford (1925).[8]
  8. ^ By November 1899, the northbound tunnel reached Trafalgar Square and work on some of the station sites was started, but the collapse of the L&GFC in 1900 led to works gradually coming to a halt. When the UERL was formed in April 1902, 50 per cent of the tunnelling and 25 per cent of the station work was completed.[42] With funds in place, work restarted and proceeded at a rate of 73 feet (22.25 m) per week,.[43] By February 1904, most of the tunnels and underground parts of the stations between Elephant & Castle and Marylebone were complete and works on the station buildings were in progress.[44] The additional stations were incorporated as work continued elsewhere.[45]
  9. ^ In 1929, construction of a spur line from Wembley Park to Stanmore began.[51] It opened on 10 December 1932.[8]
  10. ^ The L&SWR tracks to Richmond now form part of the London Underground's District line. Stations between Hammersmith and Richmond served by the MR were Ravenscourt Park, Turnham Green, Gunnersbury, and Kew Gardens.[8]

References

edit
  1. ^ "Out-of-Station Interchanges" (Microsoft Excel). Transport for London. 2 January 2016. Retrieved 28 August 2016.
  2. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
  3. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.
  4. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
  5. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 10 October 2023.
  6. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2023. Transport for London. 8 August 2024. Retrieved 16 September 2024.
  7. ^ Historic England. "Baker Street Station: Main Entrance Building and Metropolitan, Circle and Hammersmith & City line platforms (no. 1-6) including retaining wall to Approach Road (1239815)". National Heritage List for England. Retrieved 6 May 2014.
  8. ^ a b c d e f g h i j k l Rose 2007.
  9. ^ a b c d e Standard Tube Map (PDF) (Map). Not to scale. Transport for London. April 2024. Archived (PDF) from the original on 28 May 2024. Retrieved 3 June 2024.
  10. ^ "Total Population". A Vision of Britain Through Time. University of Portsmouth/Jisc. 2009. Retrieved 13 December 2015.
  11. ^ Wolmar 2004, p. 22.
  12. ^ Simpson 2003, p. 7.
  13. ^ "Metropolitan Railway Termini". The Times. No. 19277. 1 July 1846. p. 6. Retrieved 13 December 2015.
  14. ^ "Grand Central Railway Terminus". The Times. No. 19234. 12 May 1846. p. 8. Retrieved 13 December 2015.
  15. ^ a b c Day & Reed 2008, p. 9.
  16. ^ "No. 21386". The London Gazette. 30 November 1852. p. 3480.
  17. ^ Green 1987, pp. 3–4.
  18. ^ a b c "Fowler's Ghost" 1962, p. 299.
  19. ^ "No. 21497". The London Gazette. 25 November 1853. pp. 3403–3405.
  20. ^ "No. 21581". The London Gazette. 11 August 1854. pp. 2465–2466.
  21. ^ Day & Reed 2008, p. 10.
  22. ^ Jackson 1986, p. 24.
  23. ^ Walford 1878.
  24. ^ Wolmar 2004, p. 36.
  25. ^ Wolmar 2004, pp. 30 & 37.
  26. ^ Day & Reed 2008, p. 14.
  27. ^ Wolmar 2004, p. 39.
  28. ^ Green 1987, p. 11.
  29. ^ Edwards & Pigram 1988, p. 33.
  30. ^ Horne 2003, pp. 7–8.
  31. ^ Demuth & Leboff 1999, p. 9.
  32. ^ Jackson 1986, pp. 374.
  33. ^ Horne 2003, p. 13.
  34. ^ Bruce 1983, p. 20.
  35. ^ a b "No. 26225". The London Gazette. 20 November 1891. pp. 6145–6147.
  36. ^ "No. 26767". The London Gazette. 11 August 1896. pp. 4572–4573.
  37. ^ Badsey-Ellis 2005, pp. 84–85.
  38. ^ Badsey-Ellis 2005, p. 56.
  39. ^ "No. 27218". The London Gazette. 7 August 1900. pp. 4857–4858.
  40. ^ Wolmar 2004, p. 168.
  41. ^ a b Lee, Charles E. (March 1956a). "Jubilee of the Bakerloo Railway – 1". The Railway Magazine. pp. 149–156.
  42. ^ "The Underground Electric Railways Company Of London (Limited)". The Times. No. 36738. 10 April 1902. p. 12. Retrieved 2 December 2015.
  43. ^ Day & Reed 2008, p. 69.
  44. ^ "Railway And Other Companies – Baker Street and Waterloo Railway". The Times. No. 37319. 17 February 1904. p. 14. Retrieved 2 December 2015.
  45. ^ a b Wolmar 2004, p. 173.
  46. ^ Horne 2001, p. 17.
  47. ^ a b Feather, Clive (30 December 2014). "Bakerloo line". Clive's Underground Line Guides. Archived from the original on 8 December 2015. Retrieved 2 December 2015.
  48. ^ Horne 2001, p. 38.
  49. ^ a b c Bradley, Simon (2015). The Railways: Nation, Network and People. Profile Books. ISBN 9781847653529. Retrieved 9 September 2019.
  50. ^ "No. 33668". The London Gazette. 9 December 1930. pp. 7905–7907.
  51. ^ Horne 2003, p. 42.
  52. ^ Horne 2003, pp. 59–61.
  53. ^ Feather, Clive (5 October 2018). "Metropolitan line". Clive's Underground Line Guides. Archived from the original on 7 December 2018. Retrieved 8 December 2018.
  54. ^ Horne 2001, p. 48.
  55. ^ "More Tube lines discussed: Easing travel load". The Times. London. 27 April 1965. p. 7.
  56. ^ Willis, Jon (1999). Extending the Jubilee Line: The planning story. London Transport. OCLC 637966374.
  57. ^ Feather, Clive. "Bakerloo line". Clive's Underground Line Guides. Archived from the original on 2 April 2015. Retrieved 10 April 2015.
  58. ^ "London Underground map 1990". The London Tube map archive. Retrieved 21 November 2012.
  59. ^ Wolmar 2004, p. 72.
  60. ^ Lee 1956b, p. 7.
  61. ^ Jackson 1986, p. 110.
  62. ^ Day & Reed 2008, p. 18.
  63. ^ Horne 2006, pp. 5–6.
  64. ^ "1949 tube map". Retrieved 5 March 2012.
  65. ^ Earnshaw, Alan (1989). Trains in Trouble: Vol. 5. Penryn: Atlantic Books. p. 20. ISBN 0-906899-35-4.
  66. ^ "History of Baker Street Tube Station". Jessica Higgins. Archived from the original on 4 March 2012.
  67. ^ Nick, Cooper (5 June 2006). "Attacks on the London Underground". The Underground at War. Archived from the original on 23 April 2010.
  68. ^ a b c Pask, Brian. "Booking Offices at Baker Street" (PDF). Points of Interest. London Underground Railway Society. Archived (PDF) from the original on 6 February 2019. Retrieved 6 February 2019.
  69. ^ a b c Jarrier, Franklin. "Greater London Transport Tracks Map" (PDF) (Map). CartoMetro London Edition. 3.7. Archived (PDF) from the original on 18 November 2018.
  70. ^ "Step free Tube Guide" (PDF). Transport for London. April 2021. Archived (PDF) from the original on 15 May 2021.
  71. ^ "Tube Stations that only have escalators". Tube Facts and Figures. Geofftech. Archived from the original on 3 April 2015. Retrieved 10 April 2015.
  72. ^ "London Underground: 150 fascinating Tube facts". Telegraph. 9 January 2013. Archived from the original on 10 April 2015. Retrieved 10 April 2015.
  73. ^ "Stations that it takes the longest to travel between". Tube Facts and Figures. Geofftech. Archived from the original on 3 April 2015. Retrieved 10 April 2015.
  74. ^ "London's transport 'Design Icons' announced". London Transport Museum. Archived from the original on 31 March 2016. Retrieved 27 March 2016.
  75. ^ Goldstein, Danielle (4 August 2015). "Transported By Design: Vote for your favourite part of London transport". Timeout.com. Retrieved 14 July 2017.
  76. ^ "Chiltern Court". Buildington. Retrieved 24 April 2022.
  77. ^ Jones, Ian (6 January 2013). "76. The original platforms at Baker Street". 150 Great Things About the Underground. Archived from the original on 10 April 2015. Retrieved 10 April 2015.
  78. ^ "Baker Street Control Room". Flickr. November 2009. Retrieved 5 April 2017.
  79. ^ London Underground Junction Diagrams (PDF). London Underground. 2015. p. 2.
  80. ^ "London Underground train life extension". Rail Engineer. 27 July 2016. Archived from the original on 22 August 2018. Retrieved 5 April 2017.
  81. ^ "TfL's Transport Portfolio Executive Report for the London 2012 Olympic Games and Paralympic Games – Quarter 2 2007/08" (PDF). TfL. 2008. Archived (PDF) from the original on 25 April 2012.
  82. ^ "Accessible Transport Strategy for the London 2012 Olympic and Paralympic Games" (PDF). London 2012. May 2008. p. 31. Archived from the original (PDF) on 21 November 2008.
  83. ^ "Step-free access Baker Street station" (PDF). TfL. September 2008. Archived (PDF) from the original on 14 August 2013.
  84. ^ "Planning – Application Summary 08/08647/FULL". Westminster City Council. 1 October 2008. Archived from the original on 14 August 2013.
  85. ^ "TfL sets out £9.2bn 2009/2010 budget to deliver major improvements this year" (Press release). TfL. 31 March 2009. Archived from the original on 19 January 2012.
  86. ^ "'S' stock making its mark". Modern Railways. London. December 2010. p. 46.
  87. ^ "CULG – Bakerloo Line". Davros.org. Clive's UndergrounD Line Guides. 20 June 2017. Retrieved 14 July 2017.
  88. ^ "Bakerloo Line Working Timetable No. 42" (PDF). Transport for London. 21 May 2017. Archived from the original (PDF) on 13 October 2017. Retrieved 14 July 2017.
  89. ^ "CULG – Jubilee Line". www.davros.org. Retrieved 1 April 2017.
  90. ^ a b "Jubilee line working timetable" (PDF). Transport for London. Archived (PDF) from the original on 27 February 2017.
  91. ^ a b "Circle and H'Smith & City line timetable" (PDF). Transport for London. Archived from the original (PDF) on 11 November 2016.
  92. ^ Simpson 2003, p. 43.
  93. ^ "Watford Tube Guide" (PDF). Transport for London. Retrieved 6 July 2019.
  94. ^ a b "CULG – Metropolitan Line". www.davros.org. Retrieved 1 April 2017.
  95. ^ "Buses from Baker Street and Marylebone" (PDF). TfL. 28 August 2021. Retrieved 1 August 2022.
  96. ^ "Night buses from Baker Street and Marylebone" (PDF). TfL. 10 July 2021. Retrieved 1 August 2022.
  97. ^ Reid, T.R. (22 September 1999). "Sherlock Holmes honored with statue near fictional London home". The Day. New London, CT. The Washington Post. pp. A4. Retrieved 6 January 2013 – via Google News.
  98. ^ Betjeman, John; Games, Stephen (4 February 2010). Betjeman's England. John Murray Press. ISBN 9781848543805. Retrieved 9 September 2019.

Bibliography

edit
  • Badsey-Ellis, Antony (2005). London's Lost Tube Schemes. Capital Transport. ISBN 1-85414-293-3.
  • Bruce, J Graeme (1983). Steam to Silver. A history of London Transport Surface Rolling Stock. Capital Transport. ISBN 0-904711-45-5.
  • Day, John R.; Reed, John (2008) [1963]. The Story of London's Underground (10th ed.). Capital Transport. ISBN 978-1-85414-316-7.
  • Demuth, Tim; Leboff, David (1999). No Need To Ask. Harrow Weald: Capital Transport. ISBN 185414-215-1.
  • Edwards, Dennis; Pigram, Ron (1988). The Golden Years of the Metropolitan Railway and the Metro-land Dream. Bloomsbury. ISBN 1-870630-11-4.
  • "Fowler's Ghost" (May 1962). Cooke, B.W.C (ed.). "Railway connections at King's Cross (part one)". The Railway Magazine. Vol. 108, no. 733. Tothill Press.
  • Green, Oliver (1987). The London Underground: An illustrated history. Ian Allan. ISBN 0-7110-1720-4.
  • Horne, Mike (2001). The Bakerloo Line: An Illustrated History. Capital Transport. ISBN 1-85414-248-8.
  • Horne, Mike (2003). The Metropolitan Line: An Illustrated History. Capital Transport. ISBN 1-85414-275-5.
  • Horne, Mike (2006). The District Line: An Illustrated History. Capital Transport. ISBN 1-85414-292-5.
  • Jackson, Alan (1986). London's Metropolitan Railway. David & Charles. ISBN 0-7153-8839-8.
  • Lee, Charles E. (1956b). The Metropolitan District Railway. The Oakwood Press. ASIN B0000CJGHS.
  • Rose, Douglas (December 2007) [1980]. The London Underground: A Diagrammatic History (8th ed.). Capital Transport. ISBN 978-1-85414-315-0.
  • Simpson, Bill (2003). A History of the Metropolitan Railway. Volume 1: The Circle and Extended Lines to Rickmansworth. Lamplight Publications. ISBN 1-899246-07-X.
  • Walford, Edward (1878). New and Old London: Volume 5. British History Online. Retrieved 3 July 2012.
  • Wolmar, Christian (2004). The Subterranean Railway: how the London Underground was built and how it changed the city forever. Atlantic. ISBN 1-84354-023-1.

Further reading

edit
  • "The Queen visits Baker Street". The Railway Magazine. Vol. 159, no. 1345. Horncastle: Mortons Media Group. May 2013. p. 9. ISSN 0033-8923. OCLC 750645684.
edit
  NODES
Association 1
Note 15
Project 7