Line D (Ligne D) is a rapid-transit line on the Lyon Metro. It runs east–west underneath the two major rivers of Lyon, France, connecting Vieux Lyon with the Presqu'ile and the Part-Dieu region. Line D commenced operation under human control on 4 September 1991, between Gorge de Loup and Grange Blanche.[1] It was extended from Grange Blanche to Gare de Vénissieux on 11 December 1992, when it switched to automatic (driverless) operation, also known as MAGGALY (Métro Automatique à Grand Gabarit de l’Agglomération Lyonnaise).[1] On 28 April 1997, the line was extended from Gorge de Loup to Gare de Vaise.[1]
Line D | |
---|---|
Overview | |
Native name | Ligne D |
Termini | |
Connecting lines | |
Stations | 15[1] |
Service | |
Type | Rapid transit |
System | Lyon Metro |
Operator(s) | TCL |
Rolling stock | MPL 85 |
Ridership | Annual: 84,201,000 (2019)[2] |
History | |
Opened | 9 September 1991[1] |
Last extension | 28 April 1997[1] |
Technical | |
Line length | 12.5 km (7.8 mi)[1] |
Character | Driverless (MAGGALY) |
Rack system | None |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge with rollways outside of track |
Electrification | 750 V DC third rail (guide bars) |
Average inter-station distance | 929 m (3,048 ft) |
Being the deepest of the lines in Lyon, it was constructed mainly using boring machines and passes under both rivers, the Rhône and the Saône. At 12.5 kilometres (7.8 mi) long[1] and serving 15 stations,[1] it is also the longest metro line in Lyon.
List of the stations
editChronology
edit- 9 September 1991: Opening of line D from Gorge de Loup to Grange Blanche
- 11 December 1992: Extension from Grange Blanche to Gare de Vénissieux
- 28 April 1997: Extension from Gorge de Loup to Gare de Vaise
Rolling stock
editSince the opening of the line in 1991, there are 36 MPL 85 trains. The MPL 85 are composed of 2 cars per trainset.
From 2020, only during peak hours, each train could combine two MPL 85 trainsets and form a single train of 4 cars.[citation needed]
In 2016, new MPL 16 trains have been ordered to Alstom. 18 of them will circulate on the line starting from 2027, in addition to MPL 85 trains. The 2 cars of each train will be connected with gangways, which is a novelty in Lyon Metro rolling stock.[citation needed]
The MPL 16 trains won't be able to run on the line D with the current driverless system, MAGGALY. To overcome this problem, the line D will get a new driverless system, the same as the one equipping line B since 2022, where MPL 16 circulate too.[citation needed]
References
edit- ^ a b c d e f g h i "Le Métro sur le réseau TCL" [The Metro/Subway of TCL's network] (in French). TCL – SYTRAL. Archived from the original on 8 October 2014. Retrieved 28 September 2013.
- ^ "Délibération N°20.048 : Rapport Annuel des Délégataires – Année 2019" [Deliberation N°20.048 : Annual report by delegated operators – Year 2019] (PDF). SYTRAL (in French). 17 December 2020. p. 12. Retrieved 27 November 2023.