Toronto waterfront: Difference between revisions

Content deleted Content added
Pauley2483 (talk | contribs)
History: updated ferry terminal history with proper name and opening date
Line 6:
The Central Waterfront area was once an industrial and shipping area. Decades of attempts to rehabilitate the area have been made, but none have been successful. Many politicians have promised change, but it has yet to occur.
 
The current revitalization exercise has seen some progress on planning for areas such as the [http://towaterfront.ca/thirdnavloader.php?first=3e9112548cd89&second=3e9ba9dc309fc&third=3fd0b221b0dbd|East Bayfront] (Yonge Street to Cherry Street) and the [http://towaterfront.ca/thirdnavloader.php?first=3e9112548cd89&second=3e9ba9dc309fc&third=3fd773c147df1|West Don Lands] (North of the railway tracks and between Parliament Street and the Don River). These plans are expected to be
 
There are a number of [http://towaterfront.ca/topnavloader.php?first=3e9112548cd89 projects that are underway] and some that are completed.
  NODES
Project 1