Uzhhorod–Košice broad-gauge track

The UzhhorodKošice broad-gauge line is a single-track 1,520-mm-gauge railway mostly in eastern Slovakia, which is used especially for transporting iron ore from Ukraine to the steel works near Košice.

In the 1960s, after construction of the steel works in Košice, imports of iron ore to Slovakia rose steeply, and the checkpoint in Čierna nad Tisou could not handle this volume, particularly in winter, as Czechoslovakia and the Soviet Union had different gauges and all freight had to be transshipped. It was thus decided to build a Russian gauge line in Czechoslovakia to ease the bottleneck. Construction started on 4 November 1965, and the line opened on 1 May 1966. It was electrified in 1978.

Trains are hauled by two electric twin-unit locomotives, similar to the late versions of PKP's ET40 but with SA3 couplers instead of buffers and chain couplings, except of westbound between Trebišov and Ruskov where the gradient is over 15 ‰ and two sets of locos are needed. The train weights are up to 4,200 tonnes. This stretch has the heaviest catenary construction in the EU (2 work cables, 1 fitting cable and 3 additional cables).[citation needed]

This line is for freight only, but there are some diesel motor cars for railway personnel.

Technical parameters

edit
  • Length: 88.051 km (8 km in Ukraine).
  • Gauge: 1,520 mm (4 ft 11+2732 in), Russian gauge.
  • Electrification: 3 kV DC overhead.
  • Maximum speed: from Uzhhorod to Maťovce 50 km/h (31 mph), from Maťovce to Haniska pri Košiciach 60 km/h (37 mph).
  • Stations: 2 (Maťovce, Haniska pri Košiciach).
  • Crossing loops: 6 (Vojany, Budkovce, Trebišov, Červený Dvor, Slančík, Hornád).
  • Depots: 1 (Haniska pri Košiciach).
Košice–Uzhhorod broad gauge line
Technical
Track gauge1,520 mm (4 ft 11+2732 in)
Route map

 
12,576
Ужгород-1
 
trať do Čopu
 
8,7
Ужгород-2
 
0,9
Павлово
 
0,000
štátna hranica UA/SK
 
2,382
 
 
10,456
Vojany ŠRT
 
vlečka do elektrárne Vojany
 
vlečka Vojany – elektráreň Vojany (1435 mm)
 
 
21,329
 
 
 
 
53,532
Slivník (predtým Červený Dvor) ŠRT
 
65,700
 
 
 
77,808
Hornád ŠRT
 
 
86,210
 
87,159
 

Extension

edit

There are plans to extend the line 450 km westwards to Vienna in Austria. An agreement was signed between the railway operators of Austria, Slovakia, Ukraine and Russia in April 2010;[1] they formed a new company, Breitspur Planungsgesellschaft, to develop the railway. In November 2010, the Slovak Prime Minister Iveta Radičová announced the Slovak government will not support the project, as it threatens the viability of the Košice area workplaces in the Dobrá bulk terminal, which would be unnecessary after the completion of the project.[2] However, the project passed a feasibility study in December 2010.[3] Construction was planned to start in 2013 and operation in 2016. The cost estimate is €6 bn.[4] It will prove important (if really built) for the transport of containers, between Western Europe and Russia and China.[1]

In May 2021 the Austrian government stated that it has no plans to approve the construction of the extension of the line.[5]

See also

edit

References

edit
  1. ^ a b "Wien broad gauge agreement signed". Railway Gazette International. April 8, 2010.
  2. ^ Radičová sklamala Rusov. Širokorozchodná nebude - in Slovak - Hospodárske noviny, http://hnonline.sk/ekonomika/c1-48310440-radicova-sklamala-rusov-sirokorozchodna-nebude
  3. ^ "Broad gauge to Wien is feasible, says study". Railway Gazette International. December 20, 2010. Retrieved December 21, 2010.
  4. ^ "Širokorozchodnú trať chcú Rusi ťahať cez celé Slovensko až do Viedne". eTrend Slovensko. July 5, 2013. Archived from the original on March 9, 2014. Retrieved August 9, 2013.
  5. ^ Fender, Keith (May 6, 2021). "Austrian government will not support broad gauge line". International Railway Journal.
edit
  NODES
INTERN 3
Note 1
Project 3